<< Back to Emergency Response
TEXT VERSION OF SLIDE:
Title: OSHA Requirements for Emergency Response and Preparedness in Construction Industry 29 CFR
1926
Type: Text and Image Slide
Content:
Additional Requirements for Workplaces referenced in other standards
- 29 CFR 1926.35: Employee emergency action plan
Procedures:
- Prepare and implement a written action plan that includes:
- Emergency escape procedures
- Procedures for those who remain to conduct critical operations
- Means of reporting fires and emergencies
- Procedures to account for employees after the emergency
Training:
- Review emergency action plan with each employee when the plan is developed, responsibilities
shift, or the emergency procedures change.
- Provide specific training to employees who are expected to assist in evacuation
[Includes image of two people studying a floor plan]
|