Scheduled Maintenance - President's Day Weekend
The U.S. Department of Labor will be conducting scheduled system maintenance beginning Friday, Feb. 15 at 5 p.m. ET through Tuesday, Feb. 19 at 8 a.m. ET. Some pages may be temporarily unavailable. To report an emergency, file a complaint with OSHA, or to ask a safety and health question, call 1-800-321-6742 (OSHA).

<<< Back to OSHA's Asbestos Standard for the Construction Industry Link to Printing InstructionsPrinting Instructions | Text Version
 
HOME
Slides 1-10
Slide 11
Slide 12
Slide 13
Slide 14
Slide 15
Slide 16
Slide 17
Slide 18
Slide 19
Slide 20
Slides 21-30
Slides 31-40
Slides 41-50
Slides 51-60
Slides 61-70
Slides 71-80
« Previous  |  Next »
Slide 20

    TEXT VERSION OF SLIDE:

    Title: (g) Methods of Compliance (cont'd)
    Type: Text Slide
    Content:
    • Prohibitions
      • High-speed abrasive disc saws that are not equipped with point of cut ventilator or enclosures with HEPA-filtered exhaust air
      • Compressed air to remove asbestos or ACM except in conjunction with an enclosed ventilation system
      • Dry sweeping, shoveling, or other cleanup of ACM or PACM dust and debris
      • Employee rotation as as means of reducing employee exposure