Slide 42

    TEXT VERSION OF SLIDE:

    Title: (k) Communication of Hazards - Duties of Building and Facility Owners
    Type: Text Slide
    Content:
    • Before work is begun, identify the presence, location, and quantity of ACM/PACM, including
      • All TSI and sprayed on/troweled-on surfacing materials in buildings or substrates constructed no later than 1980
      • All resilient flooring material installed not later than 1980
    • Notify the following persons of the presence, location, and quantity of ACM/PACM
      • Prospective employers applying for/bidding for work
      • Employees of the owner who will work in or adjacent to areas containing such materials
      • All employers on multi-employer worksites whose employees will be performing work within or adjacent to areas containing such materials
      • Tenants who will occupy areas containing such materials