Scheduled Maintenance - President's Day Weekend
The U.S. Department of Labor will be conducting scheduled system maintenance beginning Friday, Feb. 15 at 5 p.m. ET through Tuesday, Feb. 19 at 8 a.m. ET. Some pages may be temporarily unavailable. To report an emergency, file a complaint with OSHA, or to ask a safety and health question, call 1-800-321-6742 (OSHA).

<<< Back to OSHA's Asbestos Standard for the Construction Industry Link to Printing InstructionsPrinting Instructions | Text Version
 
HOME
Slides 1-10
Slides 11-20
Slide 21
Slide 22
Slide 23
Slide 24
Slide 25
Slide 26
Slide 27
Slide 28
Slide 29
Slide 30
Slides 31-40
Slides 41-50
Slides 51-60
Slides 61-70
Slides 71-80
« Previous  |  Next »
Slide 23

    TEXT VERSION OF SLIDE:

    Title: (g) Methods of Compliance - Class I Jobs (cont'd)
    Type: Text Slide
    Content:
    • One or more of the following specific control methods shall be used fro Class I work:
      • Negative Pressure Enclosure (NPE) Systems, where the configuration of the work area does not make erection feasible
      • Glove Bag Systems, for removal of PACM and/or ACM from straight runs of piping, elbows, and other connections
      • Negative Pressure Glove Box Systems, for removal of ACM or PACM from pipe runs
      • Water Spray Process System, for removal of ACM and PACM from cold line piping, where employees have completed a separate 40-hour training course in its use