Inspection Detail
Note: The following inspection has not been indicated as closed. Please be aware that the information shown may change, e.g. violations may be added or deleted. For open cases, in which a citation has been issued, the citation information may not be available for 5 days following receipt by the employer for Federal inspections or for 30 days following receipt by the employer for State inspections.
Inspection: 1434862.015 - Kik Custom Products
Inspection Information - Office: Houston South
Site Address:
Kik Custom Products
2921 Corder Street
Houston, TX 77054
Mailing Address:
2921 Corder Street, Houston, TX 77054
Union Status: NonUnion
SIC:
NAICS: 325998/All Other Miscellaneous Chemical Product and Preparation Manufacturing
Inspection Type: Referral
Scope: Complete
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 10/01/2019
Emphasis:
Case Closed:
Type | Activity Nr | Safety | Health |
---|---|---|---|
Referral | 1503951 | Yes | Yes |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 2 | 1 | 3 | |||
Current Violations | 2 | 1 | 3 | |||
Initial Penalty | $26,988 | $0 | $67,470 | $0 | $0 | $94,458 |
Current Penalty | $13,930 | $0 | $47,470 | $0 | $0 | $61,400 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001A | Serious | 19100147 C04 I | 02/10/2020 | 04/24/2020 | $13,494 | $13,494 | $0 | I - Informal Settlement | ||
2. | 01001B | Serious | 19100147 D06 | 02/10/2020 | 04/24/2020 | $0 | $0 | $0 | I - Informal Settlement | ||
3. | 01002 | Serious | 19100151 C | 02/10/2020 | 03/27/2020 | $436 | $13,494 | $0 | I - Informal Settlement | ||
4. | 02001A | Repeat | 19100132 A | 02/10/2020 | 04/24/2020 | $47,470 | $67,470 | $0 | I - Informal Settlement | ||
5. | 02001B | Repeat | 19100132 D01 | 02/10/2020 | 03/27/2020 | $0 | $0 | $0 | I - Informal Settlement |
Investigation Summary
At 8:45 a.m. on September 28, 2019, an employee was repairing a leak on overhead piping at a chemical manufacturing facility. While working, product containing 16.5% concentrated bleach came out of the pump side of the piping came out and splashed the employee. The employee sustained second degree burns on the right side of his body and third degree burns on his buttocks. The employee was hospitalized.
Keywords:bleach, burn, buttocks, chemical, chemical burn, chemical exposure, leak, pipe, pump, repair, splashed
# | Inspection | Age | Sex | Degree | Nature | Occupation |
---|---|---|---|---|---|---|
1 | 1434862.015 | Hospitalized injury | Millwrights |