Inspection Detail
Inspection: 587409.015 - Jordan General Contractors Inc.
Inspection Information - Office: Houston North Area Office
Site Address:
Jordan General Contractors Inc.
17000 Premium Dr.
Hockley, TX 77447
Mailing Address:
15115 Fm 1488, Magnolia, TX 77354
Union Status: NonUnion
SIC:
NAICS: 238910/Site Preparation Contractors
Inspection Type: Fat/Cat
Scope: Complete
Advanced Notice: N
Ownership: Private
Safety/Health: Health
Close Conference: 09/20/2012
Emphasis: N:Dustexpl
Case Closed: 02/20/2015
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 515794 | ||
| Inspection | 587458 | Yes | |
| Inspection | 587438 | Yes |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 7 | 7 | ||||
| Current Violations | 7 | 7 | ||||
| Initial Penalty | $20,240 | $0 | $0 | $0 | $0 | $20,240 |
| Current Penalty | $15,180 | $0 | $0 | $0 | $0 | $15,180 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001A | Serious | 19100134 C01 | 02/15/2013 | 02/25/2013 | $1,980 | $2,640 | $0 | 03/05/2013 | R - Review Commission | |
| 2. | 01001B | Serious | 19100134 E01 | 02/15/2013 | 02/25/2013 | $0 | $0 | $0 | 03/05/2013 | R - Review Commission | |
| 3. | 01001C | Serious | 19100134 F02 | 02/15/2013 | 02/25/2013 | $0 | $0 | $0 | 03/05/2013 | R - Review Commission | |
| 4. | 01001D | Serious | 19100134 K | 02/15/2013 | 02/25/2013 | $0 | $0 | $0 | 03/05/2013 | R - Review Commission | |
| 5. | 01002 | Serious | 19101200 H03 II | 02/15/2013 | 02/25/2013 | $2,310 | $3,080 | $0 | 03/05/2013 | R - Review Commission | |
| 6. | 01003 | Serious | 19260352 C | 02/15/2013 | 02/25/2013 | $2,310 | $3,080 | $0 | 03/05/2013 | R - Review Commission | |
| 7. | 01004 | Serious | 19260453 B02 V | 02/15/2013 | 02/25/2013 | $1,650 | $2,200 | $0 | 03/05/2013 | R - Review Commission | |
| 8. | 01005 | Serious | 19260453 B02 VI | 02/15/2013 | 02/25/2013 | $2,310 | $3,080 | $0 | 03/05/2013 | R - Review Commission | |
| 9. | 01006 | Serious | 19260850 A | 02/15/2013 | 02/25/2013 | $2,310 | $3,080 | $0 | 03/05/2013 | R - Review Commission | |
| 10. | 01007 | Serious | 19260850 E | 02/15/2013 | 02/25/2013 | $2,310 | $3,080 | $0 | 03/05/2013 | R - Review Commission |
Investigation Summary
At 12:00 p.m. on August 12, 2012, three employees were working for a demolition contractor. They were demolishing a single-story building some 7.6 meters (twenty-five feet) tall. Two of the employees were using a shovel to clean blast material from the top of a deflector, when a third employee used a cutting torch to cut the bracket that held the deflector to the ceiling. When the employee used the cutting torch to cut the deflector from the ceiling, a flash fire occurred. OSHA sampling of the blast material in the blast room determined that the material involved was combustible dust. Two employees sustained thermal and possible blunt force trauma and they were killed. The third employee sustained burns and he was hospitalized.
Keywords: Acetylene Torch, Burn, Combustible Dust, Construction, Cutting And Burning, Demolition, Fire
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 587409.015 | 27 | M | Fatality | Laborers, except construction | |
| 2 | 587409.015 | 36 | M | Fatality | Laborers, except construction |