Inspection Detail
Inspection: 309005288 - Grand Lake Log Homes, Inc.
Inspection Information - Office: Denver Area Office
Site Address:
Grand Lake Log Homes, Inc.
255 County Road 609
Granby, CO 80446
Mailing Address:
P.O. Box 372, Grand Lake, CO 80447
Union Status: NonUnion
SIC:2452
NAICS: 321992/Prefabricated Wood Building Manufacturing
Inspection Type: Accident
Scope: Complete
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 09/26/2006
Emphasis:
Case Closed: 05/23/2007
Type | Activity Nr | Safety | Health |
---|---|---|---|
Accident | 101574184 |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 16 | 16 | ||||
Current Violations | 8 | 4 | 12 | |||
Initial Penalty | $14,850 | $0 | $0 | $0 | $0 | $14,850 |
Current Penalty | $5,610 | $0 | $0 | $2,130 | $0 | $7,740 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001 | Serious | 5A0001 | 09/26/2006 | 11/30/2006 | $525 | $750 | $0 | I - Informal Settlement | ||
2. | 01002A | Other | 19100106 B02 VIIA | 09/26/2006 | 11/14/2006 | $450 | $450 | $0 | I - Informal Settlement | ||
3. | 01002B | Serious | 19100106 E05 I | 09/26/2006 | 11/14/2006 | $0 | $0 | $0 | - | ||
4. | 01002C | Other | 19100106 E09 IV | 09/26/2006 | 11/14/2006 | $0 | $0 | $0 | I - Informal Settlement | ||
5. | 01003A | Serious | 19100106 D02 I | 09/26/2006 | 11/14/2006 | $315 | $450 | $0 | I - Informal Settlement | ||
6. | 01003B | Serious | 19100106 E09 I | 09/26/2006 | 11/14/2006 | $0 | $0 | $0 | - | ||
7. | 01004 | Other | 19100132 D01 | 09/26/2006 | 09/29/2006 | $735 | $1,050 | $0 | I - Informal Settlement | ||
8. | 01005 | Serious | 19100147 C01 | 09/26/2006 | 09/29/2006 | $525 | $750 | $0 | I - Informal Settlement | ||
9. | 01006 | Other | 19100180 D06 | 09/26/2006 | 11/14/2006 | $525 | $750 | $0 | I - Informal Settlement | ||
10. | 01007A | Serious | 19100219 C04 I | 09/26/2006 | 11/14/2006 | $0 | $750 | $0 | I - Informal Settlement | Citation has been deleted. | |
11. | 01007B | Serious | 19100219 D01 | 09/26/2006 | 11/14/2006 | $0 | $0 | $0 | I - Informal Settlement | Citation has been deleted. | |
12. | 01007C | Serious | 19100219 E01 I | 09/26/2006 | 11/14/2006 | $0 | $0 | $0 | I - Informal Settlement | Citation has been deleted. | |
13. | 01008 | Serious | 19100219 F03 | 09/26/2006 | 11/14/2006 | $0 | $750 | $0 | I - Informal Settlement | Citation has been deleted. | |
14. | 01009 | Serious | 19100265 C03 IV | 09/26/2006 | 11/14/2006 | $1,050 | $1,500 | $0 | I - Informal Settlement | ||
15. | 01010 | Serious | 19100265 E01 III | 09/26/2006 | 11/14/2006 | $420 | $600 | $0 | I - Informal Settlement | ||
16. | 01011A | Serious | 19100265 E01 IV | 09/26/2006 | 11/14/2006 | $0 | $1,500 | $0 | I - Informal Settlement | Citation has been deleted. | |
17. | 01011B | Serious | 19100265 E01 V | 09/26/2006 | 11/14/2006 | $0 | $0 | $0 | I - Informal Settlement | Citation has been deleted. | |
18. | 01012 | Serious | 19100265 E02 IIIC | 09/26/2006 | 11/14/2006 | $0 | $600 | $0 | I - Informal Settlement | Citation has been deleted. | |
19. | 01013 | Serious | 19100265 E02 IIID | 09/26/2006 | 11/14/2006 | $525 | $750 | $0 | I - Informal Settlement | ||
20. | 01014A | Other | 19101200 E01 | 09/26/2006 | 09/29/2006 | $420 | $600 | $0 | I - Informal Settlement | ||
21. | 01014B | Other | 19101200 F05 I | 09/26/2006 | 11/14/2006 | $0 | $0 | $0 | I - Informal Settlement | ||
22. | 01014C | Other | 19101200 G08 | 09/26/2006 | 09/29/2006 | $0 | $0 | $0 | I - Informal Settlement | ||
23. | 01014D | Serious | 19101200 H | 09/26/2006 | 11/30/2006 | $0 | $0 | $0 | I - Informal Settlement | ||
24. | 02001A | Serious | 19100219 C04 I | 09/26/2006 | 11/14/2006 | $750 | $750 | $0 | I - Informal Settlement | ||
25. | 02001B | Serious | 19100219 D01 | 09/26/2006 | 11/14/2006 | $0 | $0 | $0 | I - Informal Settlement | ||
26. | 02001C | Serious | 19100219 E01 I | 09/26/2006 | 11/14/2006 | $0 | $0 | $0 | I - Informal Settlement | ||
27. | 02001D | Serious | 19100219 F03 | 09/26/2006 | 11/14/2006 | $0 | $750 | $0 | I - Informal Settlement | ||
28. | 02002A | Serious | 19100265 E01 IV | 09/26/2006 | 11/14/2006 | $1,500 | $1,500 | $0 | I - Informal Settlement | ||
29. | 02002B | Serious | 19100265 E01 V | 09/26/2006 | 11/14/2006 | $0 | $0 | $0 | I - Informal Settlement | ||
30. | 02002C | Serious | 19100265 E02 IIIC | 09/26/2006 | 11/14/2006 | $0 | $600 | $0 | I - Informal Settlement |
Investigation Summary
At approximately 10:00 a.m. on July 6, 2006, Employee #1 was working for a manufacturer of log cabins. Employees were making test cuts with a newly assembled head saw. The saw had not been shut down during this activity. Following the first log cut, the trolley upon which the logs were moved toward the saw blade engaged and drove Employee #1 into the unguarded fifty-inch circular head saw blade. He sustained a laceration to his chest, and he was killed.
Keywords: CHEST, LOG, STRUCK AGAINST, CONSTRUCTION, CIRCULAR SAW, LOCKOUT, SAW, LACERATION, LUMBER, SAWMILL
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 309005288 | Fatality | Cut/Laceration | Occupation not reported |