Inspection Detail
Inspection: 304679624 - Thiro Usa Inc.
Inspection Information - Office: Long Island Area Office
Site Address:
Thiro Usa Inc.
Dock Road & Montauk Highway
Speonk, NY 11972
Mailing Address:
127 Costello Road, Newington, CT 06111
Union Status: Union
SIC:1623
NAICS: 0
Inspection Type: Accident
Scope: Complete
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 01/21/2003
Emphasis:
Case Closed: 01/31/2003
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 100150820 | ||
| Referral | 200154516 | Yes |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 1 | 1 | ||||
| Current Violations | 1 | 1 | ||||
| Initial Penalty | $3,000 | $0 | $0 | $0 | $0 | $3,000 |
| Current Penalty | $2,100 | $0 | $0 | $0 | $0 | $2,100 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001 | Serious | 5A0001 | 01/21/2003 | 01/24/2003 | $2,100 | $3,000 | $0 | I - Informal Settlement |
Investigation Summary
A power line worker was in an aerial lift, working on an energized power line. He contacted a 13.2-kilovolt phase conductor that he was not working on and was electrocuted.
Keywords: ELEC PROTECT EQUIP, OVERHEAD POWER LINE, ELECTRICAL, POWER LINE WORKER, ELECTROCUTED, E PTD, ELEC UTILITY WORK, AERIAL LIFT
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 304679624 | Fatality | Burn/Scald(Heat) | Electrical power installers and repairers |
Translate