Inspection Detail
Note: The following inspection has not been indicated as closed. OSHA citation items will be posted 30 (thirty) days after the employer receives the citation(s), except in cases of significant public interest. Posted citation items reflect any amendments to citations that are the result of a prompt settlement, which OSHA encourages. Employers and employee representatives will continue to receive copies of the citation(s) upon issuance.
Inspection: 1419279.015 - Nox Us, Llc
Inspection Information - Office: Toledo Area Office
Site Address:
Nox Us, Llc
931 South Springville Avenue
Fostoria, OH 44830
Mailing Address:
931 South Springville Avenue, Fostoria, OH 44830
Union Status: NonUnion
SIC:
NAICS: 326199/All Other Plastics Product Manufacturing
Inspection Type: Referral
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 07/30/2019
Emphasis: N:Amputate, N:Svep
Case Closed:
Type | Activity Nr | Safety | Health |
---|---|---|---|
Referral | 1480204 | Yes |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 3 | 2 | 1 | 1 | 7 | |
Current Violations | 3 | 1 | 1 | 1 | 6 | |
Initial Penalty | $26,254 | $262,544 | $26,255 | $1,876 | $0 | $316,929 |
Current Penalty | $26,254 | $131,272 | $67,474 | $0 | $0 | $225,000 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001A | Serious | 19100132 D01 I | 01/10/2020 | 01/29/2020 | $5,626 | $5,626 | $0 | 02/05/2020 | F - Formal Settlement | |
2. | 01001B | Other | 19100138 A | 01/10/2020 | 01/29/2020 | $0 | $0 | $0 | 02/05/2020 | F - Formal Settlement | |
3. | 01002 | Serious | 19100212 A01 | 01/10/2020 | 01/24/2020 | $13,127 | $13,127 | $0 | 02/05/2020 | F - Formal Settlement | |
4. | 01003 | Serious | 19100219 C04 I | 01/10/2020 | 01/29/2020 | $7,501 | $7,501 | $0 | 02/05/2020 | F - Formal Settlement | |
5. | 03001 | Repeat | 19100147 C07 I | 01/10/2020 | 01/17/2020 | $67,474 | $26,255 | $0 | 02/05/2020 | F - Formal Settlement | |
6. | 04001 | Other | 19040040 A | 01/10/2020 | $0 | $1,876 | $0 | 02/05/2020 | F - Formal Settlement | ||
7. | 05001A | Willful | 19100147 C04 I | 01/10/2020 | 01/17/2020 | $131,272 | $131,272 | $0 | 02/05/2020 | F - Formal Settlement | |
8. | 05001B | Willful | 19100147 D | 01/10/2020 | 01/17/2020 | $0 | $131,272 | $0 | 02/05/2020 | F - Formal Settlement |
Investigation Summary
At 1:30 p.m. on July 23, 2019, an employee was working with two coworkers unjamming material that had wrapped around rubber lamination rollers. A malfunction in the process had caused a layer of the flooring material to be removed and caused the sticky midlayer to wrap around a rubber roller. The employee and two coworkers responded to line alarms and accessed the area under the lamination rollers where the material wrapped up which was in in immediate proximity to the rotating parts. The employee and two coworkers all used their hands and knives to unjam the material from the rollers without locking out the machine first. During this process, the employee caught his right arm in between the rotating parts and used his other hand trying to pull his arm out. The employee incurred crushing injuries and burns to his lower right arm resulting in his lower right arm and all the fingers on his left hand being amputated. The employee was hospitalized for treatment.
Keywords: Adhesive, Amputated, Amputation, Arm, Burn, Caught By, Caught In, Conveyor, Crushed, Energized, Finger, Flooring , Hand, Hand Tool, Jammed, Lack of Work Procedures, Lockout, Lockout/Tagout, Malfunction, Pinched, Plastic Mfg, Point Of Operation, Roller Conveyor, Rotating Parts
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 1419279.015 | 40 | F | Hospitalized injury | Laborers, except construction |