Inspection Detail

Inspection: 316816883 - Antioch Building Materials, Inc.

Inspection Information - Office: American Canyon District Office

 

Inspection Nr: 316816883
Report ID: 0950622
Date Opened: 03/25/2013

Site Address:
Antioch Building Materials, Inc.
1375 California Ave.
Pittsburg, CA 94565

Mailing Address:
Po Box 870, Antioch, CA 94509

Union Status: NonUnion

SIC:5211

NAICS: 444190/Other Building Material Dealers


Inspection Type: Accident

Scope: Partial

Advanced Notice: N

Ownership: Private

Safety/Health: Safety

Close Conference: 05/23/2013

Emphasis:

Case Closed: 01/18/2014


Related Activity
Type Activity Nr Safety Health
Accident 102693645
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 1 7 8
Current Violations 1 7 8
Initial Penalty $3,600 $0 $0 $2,000 $0 $5,600
Current Penalty $1,800 $0 $0 $1,600 $0 $3,400
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Other 3314 H03 05/30/2013 07/02/2013 $300 $400 $0 06/06/2013 F - Formal Settlement  
2. 01002 Other 3321 A 05/30/2013 07/02/2013 $400 $500 $0 06/06/2013 F - Formal Settlement  
3. 01003 Other 3329 D 05/30/2013 07/02/2013 $400 $400 $0 06/06/2013 F - Formal Settlement  
4. 01004 Other 3395 D01 05/30/2013 07/02/2013 $100 $100 $0 06/06/2013 F - Formal Settlement  
5. 01005 Other 5157 C03 05/30/2013 07/02/2013 $200 $200 $0 06/06/2013 F - Formal Settlement  
6. 01006 Other 5194 E01 A 05/30/2013 07/02/2013 $200 $200 $0 06/06/2013 F - Formal Settlement  
7. 01007 Other 5194 F04 05/30/2013 07/02/2013 $0 $200 $0 06/06/2013 F - Formal Settlement  
8. 02001 Serious 5162 A 05/30/2013 07/02/2013 $1,800 $3,600 $0 06/06/2013 F - Formal Settlement  

Investigation Summary

Investigation Nr: 202509782
Event: 03/22/2013
Worker Removes Wrong Valve and Is Sprayed with Hot Asphalt

On March 22, 2013, Employee #1, a 58-year-old male with Antioch Building Materials Inc, removed a valve from the wrong storage tank, containing 27,000 gallons of 350-degree Fahrenheit asphalt. Employee #1 was sprayed by the hot asphalt mix and sustained second degree burn injuries from the event that required hospitalization.

Keywords: BURN, STORAGE TANK, VALVE, CHEMICAL BURN, ASPHALT

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 316816883 Hospitalized injury Burn/Scald(Heat) Mixing and blending machine operators
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.