Inspection Detail
Inspection: 315343772 - Priority Remodeling Plumbing & Ac
Inspection Information - Office: San Diego District Office
Site Address:
Priority Remodeling Plumbing & Ac
11370 N Woodside Ave
Santee, CA 92071
Mailing Address:
1953 Via Encantadoras, San Diego, CA 92173
Union Status: NonUnion
SIC:1721
NAICS: 238320/Painting and Wall Covering Contractors
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 04/25/2012
Emphasis:
Case Closed: 04/25/2017
Type | Activity Nr | Safety | Health |
---|---|---|---|
Accident | 101470086 |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 1 | 7 | 8 | |||
Current Violations | 1 | 7 | 8 | |||
Initial Penalty | $10,800 | $0 | $0 | $5,600 | $0 | $16,400 |
Current Penalty | $1,575 | $0 | $0 | $5,600 | $0 | $7,175 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001 | Other | 342 A | 04/25/2012 | 06/11/2012 | $5,000 | $5,000 | $0 | 05/14/2012 | F - Formal Settlement | |
2. | 01002 | Other | 1509 C | 04/25/2012 | 06/11/2012 | $175 | $175 | $0 | 05/14/2012 | F - Formal Settlement | |
3. | 01003 | Other | 3203 A | 04/25/2012 | 06/11/2012 | $85 | $85 | $0 | 05/14/2012 | F - Formal Settlement | |
4. | 01004 | Other | 1512 B | 04/25/2012 | 06/11/2012 | $85 | $85 | $0 | 05/14/2012 | F - Formal Settlement | |
5. | 01005 | Other | 3276 F | 04/25/2012 | 06/11/2012 | $85 | $85 | $0 | 05/14/2012 | F - Formal Settlement | |
6. | 01006 | Other | 3395 F01 | 04/25/2012 | 06/11/2012 | $85 | $85 | $0 | 05/14/2012 | F - Formal Settlement | |
7. | 01007 | Other | 3395 F03 | 04/25/2012 | 06/11/2012 | $85 | $85 | $0 | 05/14/2012 | F - Formal Settlement | |
8. | 02001 | Serious | 3276 E09 | 04/25/2012 | 05/09/2012 | $1,575 | $10,800 | $0 | 05/14/2012 | F - Formal Settlement |
Investigation Summary
At approximately 12:25p.m.on February 24, 2012 Employee # 1 was working as a part-time painter for Priority Remodeling Plumbing and Air Conditioning. Employee #1 was up on a 34 foot fiberglass extension ladder painting the trim on backside of a building leased by Certified Car Care. Employee #1 was using a power sprayer with his right hand in order to spray the trim in 5 to 6 feet sweeps while standing on the ladder. The extension ladder employee # 1 was standing slipped away from the stucco wall it was propped up against. Employee #1 fell 18 feet from the extension ladder to the cement ground. Employee # 1 sustained a broken right wrist, left elbow, and right knee. Employee #1 was transported to Scripps Memorial Hospital in San Diego. Employee #1 was hospitalized for six days and had multiple surgeries and diagnosis testing. The accident was reported to Division of Occupation Health and Safety on February 27, 2012.
Keywords: KNEE, EXTENSION LADDER, FALL, ELBOW, PAINTER, WRIST
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 315343772 | Hospitalized injury | Other | Painters, construction and maintenance |