Inspection Detail
Inspection: 315098566 - Blowout Tools, Inc.
Inspection Information - Office: Corpus Christi Area Office
Site Address:
Blowout Tools, Inc.
Fm Hwy 2987 To Fannin Oaks Drive
Fannin, TX 77963
Mailing Address:
Drill Technology Center 2202 Oil Center Court, Houston, TX 77073
Union Status: NonUnion
SIC:1389
NAICS: 213112/Support Activities for Oil and Gas Operations
Inspection Type: Accident
Scope: Complete
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 04/07/2011
Emphasis: L:Oilgas
Case Closed: 01/31/2013
Type | Activity Nr | Safety | Health |
---|---|---|---|
Accident | 100213727 |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 9 | 9 | ||||
Current Violations | 9 | 9 | ||||
Initial Penalty | $45,900 | $0 | $0 | $0 | $0 | $45,900 |
Current Penalty | $45,900 | $0 | $0 | $0 | $0 | $45,900 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001 | Serious | 19100023 C01 | 04/26/2011 | 05/02/2011 | $4,500 | $4,500 | $0 | 05/17/2011 | F - Formal Settlement | |
2. | 01002 | Serious | 19100146 C02 | 04/26/2011 | 05/02/2011 | $4,500 | $4,500 | $0 | 05/17/2011 | F - Formal Settlement | |
3. | 01003 | Serious | 19100146 C09 III | 04/26/2011 | 05/02/2011 | $4,500 | $4,500 | $0 | 05/17/2011 | F - Formal Settlement | |
4. | 01004 | Serious | 19100146 D01 | 04/26/2011 | 05/02/2011 | $4,500 | $4,500 | $0 | 05/17/2011 | F - Formal Settlement | |
5. | 01005 | Serious | 19100146 D02 | 04/26/2011 | 05/02/2011 | $6,300 | $6,300 | $0 | 05/17/2011 | F - Formal Settlement | |
6. | 01006A | Serious | 19100146 D03 VI | 04/26/2011 | 05/02/2011 | $6,300 | $6,300 | $0 | 05/17/2011 | F - Formal Settlement | |
7. | 01006B | Serious | 19100146 D04 I | 04/26/2011 | 05/02/2011 | $0 | $0 | $0 | 05/17/2011 | F - Formal Settlement | |
8. | 01006C | Serious | 19100146 D05 I | 04/26/2011 | 05/02/2011 | $0 | $0 | $0 | 05/17/2011 | F - Formal Settlement | |
9. | 01007 | Serious | 19100146 D04 IX | 04/26/2011 | 05/02/2011 | $6,300 | $6,300 | $0 | 05/17/2011 | F - Formal Settlement | |
10. | 01008 | Serious | 19100146 D09 | 04/26/2011 | 05/02/2011 | $4,500 | $4,500 | $0 | 05/17/2011 | F - Formal Settlement | |
11. | 01009 | Serious | 19100146 E01 | 04/26/2011 | 05/02/2011 | $4,500 | $4,500 | $0 | 05/17/2011 | F - Formal Settlement |
Investigation Summary
On October 30, 2010, Employee #1, a production supervisor, had installed a liquid nitrogen jacket around the outside of the conductor pipe and was flowing liquid nitrogen in order to form a plug. Employee #1 was found by coworkers, collapsed in the hole. He was removed by his coworkers, but he had already died.
Keywords: LUNG, PIPE PLUG, ASPHYXIATED, VAPOR, NITROGEN, PIPE, CHEMICAL VAPOR, TOXIC FUMES
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 315098566 | Fatality | Asphyxia | Supervisors, production occupations |