Inspection Detail
Inspection: 314865544 - Bronco Roofing
Inspection Information - Office: Los Angeles District Office
Site Address:
Bronco Roofing
321 N. Orange St.
Glendale, CA 91204
Mailing Address:
811 E. Lincoln St., Orange, CA 92865
Union Status: NonUnion
SIC:1761
NAICS: 238160/Roofing Contractors
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 10/24/2013
Emphasis: S:Construction (Cship)
Case Closed: 08/09/2014
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 102765245 |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 2 | 2 | ||||
| Current Violations | 2 | 2 | ||||
| Initial Penalty | $0 | $0 | $0 | $1,010 | $0 | $1,010 |
| Current Penalty | $0 | $0 | $0 | $675 | $0 | $675 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001 | Other | 1725 D | 10/28/2013 | 10/31/2013 | $450 | $675 | $0 | 11/03/2013 | F - Formal Settlement | |
| 2. | 01002 | Other | 3395 F03 | 10/28/2013 | 07/15/2014 | $225 | $335 | $0 | 11/03/2013 | F - Formal Settlement |
Investigation Summary
At approximately 6:00 a.m. on August 5, 2013, Employee # 1 arrived at the work site with a roofing crew and was setting up for the day. Part of the set-up was the kettle used in the asphalt molten. The kettle was half full and Employee #1 ignited the burners and lowered the flame in the kettle. He walked away from the kettle and went to the portable toilet over 100 feet away. Employee #1 heard a "pop" and immediately returned to the kettle area, where he saw a small flame coming from the kettle pot from under the lid. He attempted to extinguish the fire with an extinguisher without success. Employee #1 then called the fire department, turned off the propane, disconnected the fuel hose, moved the truck away from the kettle, and continued attempts to extinguish the fire with fire extinguishers and sand, until the fire department arrived. While attempting to extinguish the fire and waiting for the fire department, Employee #1 sustained a two-inch second degree burn to his right triceps when a flame flared from under the kettle lid; he declined all medical treatment.
Keywords: BURN, FIRE, ARM
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 314865544 | Non Hospitalized injury | Burn/Scald(Heat) | Occupation not reported |
Translate