Inspection: 313648123 - C P Kelco

Inspection Information - Office: Labor Enforcement Task Force (Letf) Unit - Central

 

Inspection Nr: 313648123
Report ID: 0950664
Date Opened: 05/14/2013

Site Address:
C P Kelco
2025 East Harbor Drive
San Diego, CA 92113

Mailing Address:
, , 00000

Union Status: Union

SIC:2099

NAICS: 311999/All Other Miscellaneous Food Manufacturing


Inspection Type: Accident

Scope: Partial

Advanced Notice: N

Ownership: Private

Safety/Health: Safety

Close Conference: 11/01/2013

Planning Guide: Safety-Manufacturing

Emphasis:

Case Closed: 11/01/2013


Related Activity
Type Activity Nr Safety Health
Accident 101037059

Investigation Summary

Investigation Nr: 202532032
Event: 05/02/2013
Worker Opens Blowdown Valve on Vessel, Burned with Steam

At approximately 6:00 a.m. on May 2, 2013, Employee #1, a 67-year-old male electrical and instrumentation technician with C P Kelco was working at a site on East Harbor Drive in San Diego. Employee #1 wanted to reset a control valve for an unrelated process downstream from vessel D-16, a fermenter. Employee #1 knew that the steam is released periodically from the vessel in a process called a "blow down." Employee #1 needed to access the valve, which was adjacent to vessel D-16. Employee #1 did not know this, but Vessel D-16 had been undergoing steam sterilization for three-hours and was about to be emptied. The resetting of the valve would only take a few minutes. Employee #1 did not check in with the Vessel D-16 operator. After following his standard procedure and ensuring that no one was in the immediate area, then hanging caution signs and chains, the Vessel D-16 operator went up the stairway to activate the remotely controlled steam blow down valve. While a coworker was walking upstairs, Employee #1 entered the area and began his work with the other control valve. He said he saw coworker upstairs, but did not talk to him. The coworker said that he did not see Employee #1 in the area. The employer had installed a 6 ft tall cylindrical sheet metal curtain or "muffler" around the steam blow down outlet to protect workers. This curtain was open at the bottom at a level about 6 in. above the floor, thus allowing steam to exit at floor level. When the coworker opened the blow down valve, steam exited the vessel and billowed out at floor level around the metal curtain or "muffler". Employee #1 could not see, but he crawled under a waist high horizontal pipe, next to the muffler. His pant legs were open and when crawling, his legs were in contact with the hot, wet floor. The fronts of his lower legs were burned by the steam. Employee #1 washed off with a nearby hose, reported his injury and was taken by ambulance to the UCSD Medical Center where he was treated for second degree burns to both shins and was hospitalized for two-weeks. CP Kelco was a manufacturer of food additives.

Keywords: BURN, VAPOR, PRESSURE VESSEL, LOCKOUT, VALVE, PIPE, SKIN, PRESSURE RELEASE, HOT WATER

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 313648123 Hospitalized injury Burn/Scald(Heat) Machinery maintenance occupations
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.