Inspection Detail
Inspection: 312731425 - Ndk Crystals, Inc.
Inspection Information - Office: Naperville Area Office
Site Address:
Ndk Crystals, Inc.
701 Crystal Parkway
Belvidere, IL 61008
Mailing Address:
, , 00000
Union Status: NonUnion
SIC:2819
NAICS: 325998/All Other Miscellaneous Chemical Product and Preparation Manufacturing
Inspection Type: Referral
Scope: Complete
Advanced Notice: N
Ownership: Private
Safety/Health: Health
Close Conference: 05/13/2010
Emphasis:
Case Closed: 05/12/2015
Type | Activity Nr | Safety | Health |
---|---|---|---|
Referral | 200824530 | Yes | Yes |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 5 | 10 | 15 | |||
Current Violations | 5 | 3 | 8 | |||
Initial Penalty | $20,000 | $980,000 | $0 | $0 | $0 | $1,000,000 |
Current Penalty | $6,000 | $174,000 | $0 | $0 | $0 | $180,000 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001 | Serious | 5A0001 | 05/27/2010 | 06/29/2010 | $2,000 | $7,000 | $0 | 06/04/2010 | J - ALJ Decision | |
2. | 01002 | Serious | 19100038 C01 | 05/27/2010 | 06/29/2010 | $2,000 | $7,000 | $0 | 06/04/2010 | J - ALJ Decision | |
3. | 01003A | Serious | 19100132 D02 | 05/27/2010 | 06/29/2010 | $750 | $2,000 | $0 | 06/04/2010 | J - ALJ Decision | |
4. | 01003B | Serious | 19100132 F04 | 05/27/2010 | 06/29/2010 | $0 | $0 | $0 | 06/04/2010 | - | |
5. | 01004 | Serious | 19101200 E01 | 05/27/2010 | 06/29/2010 | $750 | $2,000 | $0 | 06/04/2010 | J - ALJ Decision | |
6. | 01005 | Serious | 19101200 H01 | 05/27/2010 | 06/29/2010 | $500 | $2,000 | $0 | 06/04/2010 | J - ALJ Decision | |
7. | 02001 | Willful | 5A0001 | 05/27/2010 | 06/29/2010 | $0 | $70,000 | $0 | 06/04/2010 | J - ALJ Decision | Citation has been deleted. |
8. | 02002 | Willful | 5A0001 | 05/27/2010 | 06/29/2010 | $0 | $70,000 | $0 | 06/04/2010 | J - ALJ Decision | Citation has been deleted. |
9. | 02003 | Willful | 5A0001 | 05/27/2010 | 06/29/2010 | $0 | $70,000 | $0 | 06/04/2010 | J - ALJ Decision | Citation has been deleted. |
10. | 02004 | Willful | 5A0001 | 05/27/2010 | 06/29/2010 | $0 | $70,000 | $0 | 06/04/2010 | J - ALJ Decision | Citation has been deleted. |
11. | 02005 | Willful | 5A0001 | 05/27/2010 | 06/29/2010 | $0 | $70,000 | $0 | 06/04/2010 | J - ALJ Decision | Citation has been deleted. |
12. | 02006 | Willful | 5A0001 | 05/27/2010 | 06/29/2010 | $0 | $70,000 | $0 | 06/04/2010 | J - ALJ Decision | Citation has been deleted. |
13. | 02007 | Willful | 5A0001 | 05/27/2010 | 06/29/2010 | $0 | $70,000 | $0 | 06/04/2010 | J - ALJ Decision | Citation has been deleted. |
14. | 03001A | Willful | 5A0001 | 05/27/2010 | 06/29/2010 | $58,000 | $70,000 | $0 | 06/04/2010 | J - ALJ Decision | |
15. | 03001B | Willful | 5A0001 | 05/27/2010 | 06/29/2010 | $0 | $70,000 | $0 | 06/04/2010 | J - ALJ Decision | |
16. | 03002A | Willful | 5A0001 | 05/27/2010 | 06/29/2010 | $58,000 | $70,000 | $0 | 06/04/2010 | J - ALJ Decision | |
17. | 03002B | Willful | 5A0001 | 05/27/2010 | 06/29/2010 | $0 | $70,000 | $0 | 06/04/2010 | J - ALJ Decision | |
18. | 03003A | Willful | 5A0001 | 05/27/2010 | 06/29/2010 | $58,000 | $70,000 | $0 | 06/04/2010 | J - ALJ Decision | |
19. | 03003B | Willful | 5A0001 | 05/27/2010 | 06/29/2010 | $0 | $70,000 | $0 | 06/04/2010 | J - ALJ Decision | |
20. | 03003C | Willful | 5A0001 | 05/27/2010 | 06/29/2010 | $0 | $70,000 | $0 | 06/04/2010 | J - ALJ Decision |
Investigation Summary
At approximately 2:36 pm on December 7, 2009, an explosion occurred when producing AT and Optical Crystals in high pressure autoclaves/vessels. The high pressure vessels were manufactured by Engineered Pressure Systems, Inc. Employees were required to load and unload the high pressure vessels with propriety substances. Once the vessels were loaded, the employees monitored the process and performed other duties. During the operation, vessel Number 2 exploded and released high temperature caustic solvent that created a large plume. The pressure blast destroyed the facility and emitted debris onto adjacent properties. A truck driver on an adjacent highway was struck by the flying building material and was killed instantly. The truck driver was not an employee of NDK Crystals. Employees working at the NDK facility received minor injuries such as lacerations and contusions. Employees at the plant were provided some training on the process, but were not provided adequate training on hazard communication and PPE. All employees at the facility spoke English. Employees were provided with some PPE, but only for the loading and unloading process. The preliminary findings were that the explosion was related to stress fractures and corrosion cracking.
Keywords: PRESSURE VESSEL, EXPLOSION, CORROSION, UNTRAINED
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 312731425 | Non Hospitalized injury | Cut/Laceration | Chemical technicians |