Inspection: 310742630 - Dallas Electrical Contractors, Inc.

Inspection Information - Office: Nc Department Of Labor - Charlotte

 

Inspection Nr: 310742630
Report ID: 0453730
Date Opened: 02/09/2007

Site Address:
Dallas Electrical Contractors, Inc.
2467 Jennings Rd
Olin, NC 28660

Mailing Address:
Po Box 1592, Gastonia, NC 28053

Union Status: NonUnion

SIC:1731

NAICS: 238210/Electrical Contractors


Inspection Type: Accident

Scope: Partial

Advanced Notice: N

Ownership: Private

Safety/Health: Safety

Close Conference: 04/26/2007

Planning Guide: Safety-Construction

Emphasis: S:Construction Sep

Case Closed: 06/22/2007


Related Activity
Type Activity Nr Safety Health
Accident 102096906
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations 1 1
Initial Penalty $1,400 $0 $0 $0 $0 $1,400
Current Penalty $700 $0 $0 $0 $0 $700
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Serious 19260416 A01 05/03/2007 05/11/2007 $700 $1,400 $0 I - Informal Settlement  

Investigation Summary

Investigation Nr: 202078028
Event: 02/09/2007
Employee injured in fall from ladder after electric shock

At approximately 10:30 a.m. on February 9, 2007, Employee #1, the lead man, and a coworker who was working with him on the project that day, were removing overhead lighting fixtires in a classroom. Employee #1 instructed the coworker to remove the light fixtures and he would disconnect the electrical whips. He identified the electrical junction box entering the classroom, and planned to remove the wire nuts and disconnect the wires running through the ceiling that energized the light fixtures. Once the lighting system was no longer energized, the lighting and overhead wiring could be removed safely. Employee #1 identified there was no switch or disconnect, only the main feed for that classroom. Since school classes were in session, he did not want to shut down the main electrical feed into the lighting system but, instead, to physically disconnect the wires at the junction box. Employee #1 was standing on a fiberglass stepladder, removed the junction box cover, and then began to remove the wire nuts with his bare hands. As he was working, he contacted an energized electrical conductor and he fell off the ladder onto the concrete floor. He sustained three bruised ribs and required 12 stitches to close a head laceration. The employer provided rubber insulated gloves and sleeves for employees to wear when working on or near energized electrical conductor, but Employee #1 was not using either of these.

Keywords: ELEC PROTECT EQUIP, HEAD, LIGHTING CIRCUIT, ELECTRICAL, LADDER, CONSTRUCTION, ELECTRICAL WORK, ELEC CIRC PART--MISC, ELECTRIC SHOCK, FALL

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 310742630 Hospitalized injury Bruise/Contus/Abras Electricians
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.