Inspection: 309349413 - Henkels & Mccoy, Inc.

Inspection Information - Office: Mobile Area Office

 

Inspection Nr: 309349413
Report ID: 0418600
Date Opened: 11/18/2005

Site Address:
Henkels & Mccoy, Inc.
3100 Odom Road
Chunchula, AL 36521

Mailing Address:
985 Jolly Road, Blue Bell, PA 19422

Union Status: Union

SIC:4911

NAICS: 221121/Electric Bulk Power Transmission and Control


Inspection Type: Accident

Scope: Partial

Advanced Notice: N

Ownership: Private

Safety/Health: Safety

Close Conference: 11/18/2005

Emphasis: L:Ohpwrlne

Case Closed: 12/01/2006


Related Activity
Type Activity Nr Safety Health
Accident 100452648
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 3 3
Current Violations 1 1
Initial Penalty $21,000 $0 $0 $0 $0 $21,000
Current Penalty $7,000 $0 $0 $0 $0 $7,000
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Serious 19100269 C 04/04/2006 04/10/2006 $0 $7,000 $0 04/17/2006 F - Formal Settlement Citation has been deleted.
2. 01002 Serious 19100269 M03 V 04/04/2006 04/10/2006 $7,000 $7,000 $0 04/17/2006 F - Formal Settlement  
3. 01003 Serious 19100269 N03 04/04/2006 04/10/2006 $0 $7,000 $0 04/17/2006 F - Formal Settlement Citation has been deleted.

Investigation Summary

Investigation Nr: 200451938
Event: 11/17/2005
Electric Shock - Induced Voltage in Deenergized Line

A power line crew for a contractor was replacing rusted guys on several utility poles. The crew inadvertently broke one of the poles. The next day, the electric utility deenergized the 115-kilovolt line supported by the pole and gave a clearance to the power line crew. Although the line supported by that pole was deenergized, other energized power lines, with voltages of 115 and 230 kilovolts, were nearby. The crew did not test the deenergized line for voltage and did not ground it before replacing the pole. The crew set the new pole, moved the static line from the old pole to the new one, and attached hardware to the new pole. An apprentice power line worker and a journeyman power line worker were working from an aerial lift. They were standing on a metal come-along at the bottom of the aerial lift bucket. A piece of the come-along draped over the bucket. The apprentice was electrocuted when he grabbed a wire rope sling attached to the new pole. Induced voltage from the nearby energized lines had energized the deenergized line, and the come-along was touching the deenergized line. The apprentice had entry and exit wounds on his right foot and left hand.

Keywords: OVERHEAD POWER LINE, PROTECTIVE GROUNDING, ELECTRICAL, POWER LINE WORKER, ELECTROCUTED, E PTD, INDUCED CURRENT, ELEC UTILITY WORK, AERIAL LIFT

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 309349413 Fatality Electric Shock Electrical power installers and repairers
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.