Inspection: 309287175 - Marathon Petroleum Company, Llc

Inspection Information - Office: Fairview Heights

Nr: 309287175Report ID: 0524530Open Date: 01/21/2007

Marathon Petroleum Company, Llc
400 S. Marathon Ave.
Robinson, IL 62454
Union Status: NonUnion
SIC: 2911/Petroleum Refining
NAICS: 324110/Petroleum Refineries
Mailing: P.O. Box 1200, Robinson, IL 62454

Inspection Type:Accident
Scope:Partial Advanced Notice:N
Ownership:Private
Safety/Health:Health Close Conference:04/10/2007
Close Case:12/26/2007

Related Activity:TypeIDSafetyHealth
 Accident100841766    

Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 5 5
Current Violations 5 5
Initial Penalty $25,000 $0 $0 $0 $0 $25,000
Current Penalty $25,000 $0 $0 $0 $0 $25,000
FTA Amount $0 $0 $0 $0 $0 $0

Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
  1. 01001A Serious 19100119 E03 I 06/19/2007 08/31/2007 $5,000 $5,000 $0 I - Informal Settlement
  2. 01001B Serious 19101000 B02 06/19/2007 07/16/2007 $0 $0 $0 -
  3. 01002 Serious 19100119 E03 VI 06/19/2007 08/31/2007 $5,000 $5,000 $0 I - Informal Settlement
  4. 01003 Serious 19100119 F01 06/19/2007 08/31/2007 $5,000 $5,000 $0 I - Informal Settlement
  5. 01004 Serious 19100119 F01 IE 06/19/2007 07/16/2007 $5,000 $5,000 $0 -
  6. 01005 Serious 19100119 M02 06/19/2007 08/31/2007 $5,000 $5,000 $0 I - Informal Settlement

Accident Investigation Summary
Summary Nr: 200841302Event: 01/20/2007Employee Is Killed From Toxic Fumes
On January 20, 2007, Employee #1 was working in the Hydrofluoric Acid, (HF), and Alkylation Unit in charge of maintaining the neutralization pits. He was in charge of draining a constant boiling mixture, (CBM's), which contained HF acid and water out of the polymer surge drum into a neutralization pit. The CBM's, low in pH, and were sent to the South neutralization pit to neutralize spent potassium hydroxide that was contained in the open-surfaced pit. Potassium hydroxide, (KOH), is highly basic and CBM's are drained into the South pit to lower or neutralize the pH. The draining of CBM's is accomplished by pressurizing the polymer surge drum with a constant supply of natural gas. The vessel is pressurized to 25 to 30 pounds and then a drain valve is manually opened and CBM's are forced out into the South neutralization pit. The operator visually watches the CBM's come out of a discharge pipe into the South neutralization pit. When the operator sees a color change, indicating that the CBM's have been evacuated from the vessel and polymer is now entering the South pit, the drain valve is then closed. The pH is checked manually with the use of litmus paper. When the solution in the South pit has reached a pH range of 7 to 9, the contents are then sent to the North pit for further treatment. Once the mixture is fully neutralized it is sent to waste water. On the January 19th, 2007, the operator had drained the CBM's out of the polymer surge drum and performed an unusually long draw. The draining of CBM's, which normally takes seconds, had taken three minutes. Depending on the position of the drain valve this could have introduced a large volume of polymer into the South pit. Polymer or acid soluble oils, (ASO), have a low pH and contain sulfur compounds. Later that day, a large volume of spent KOH was sent to the South pit, approximately 940 gallons. This would have been performed to further regulate pH. On the January 20th, 2007, the liquid level in the South pit was close to the top edge. At some point the drain valve on the South pit was turned in the open position. There is only one reason the drain on the South pit would have been opened; to lower the level in the pit because the contents were going to flow over the top of the pit. The drain on the South pit is normally closed, due to the fact that the contents have to be sent to the North pit for further treatment. On January 20, 2007, Employee #1 opened the drain on the South pit and the head pressure from the South pit released vapors. The vapors traveled up to Employee #1 who lost consciousness. No respiratory protection was worn by Employee #1, and he was wearing an H2S dosimeter. It is undetermined at this time if the dosimeter was working properly. When coworkers found Employee #1, they stated that the H2S monitor was alarming. The highest reading from the dosimeter was 95 ppm. The wind was blowing from the South but steam traps showed that the wind was also swirling near the pit. Employee #1 died from acute hydrogen sulfide intoxication.
Keywords: unconsciousness, vapor, ppe, hydrogen sulfide, inhalation, chemical, respirator
Inspection Degree Nature Occupation
1 309287175 Fatality Asphyxia Miscellaneous plant and system operators

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.

Close