Inspection Detail
Inspection: 307028118 - Quality Plastering
Inspection Information - Office: San Diego District Office
Site Address:
Quality Plastering
Via Bahia Phase 8
San Marcos, CA 92069
Mailing Address:
21778 Temescal Canyon Rd, Corona, CA 92069
Union Status: NonUnion
SIC:1771
NAICS: 238140/Masonry Contractors
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 05/25/2004
Planning Guide: Safety-Construction
Emphasis: S:Construction (Cship)
Case Closed: 11/08/2004
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 362064313 |
Investigation Summary
At approximately 10:30 a.m. on May 8, 2004, an employee was operating a Ryobi brand compound miter saw at a job site. He was attempting to cut a piece of aluminum channel used for lathing. The employee said that the workpiece suddenly pulled into blade abruptly and caused his hand to follow. He cut off the tip of a finger and lacerated part of the hand. He was hospitalized and treated for amputation.
Keywords: AMPUTATED, FINGER, CONSTRUCTION, SAW, HAND
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 307028118 | Hospitalized injury | Amputation | Plasterers |
Translate