Inspection Information - Office: Wichita | ||||
---|---|---|---|---|
Nr: 305030207 | Report ID: 0729700 | Open Date: 09/14/2002 | ||
Marlatt Construction, Inc. | ||||
1300 Main Atchison, KS 66002 | Union Status: NonUnion | |||
SIC: 1799/Special Trade Contractors, Not Elsewhere Classified | ||||
NAICS: 562910/Remediation Services | ||||
Mailing: 17588 274 Road, Atchison, KS 66002 | ||||
Inspection Type: | Unprog Rel | |||
Scope: | Complete | Advanced Notice: | N | |
Ownership: | Private | |||
Safety/Health: | Safety | Close Conference: | 02/07/2003 | |
Emphasis: | S:Construction | Close Case: | 03/25/2003 | |
Related Activity: | Type | ID | Safety | Health |
Accident | 101342376 |
Violation Summary | ||||||
---|---|---|---|---|---|---|
Serious | Willful | Repeat | Other | Unclass | Total | |
Initial Violations | 2 | 1 | 3 | |||
Current Violations | 2 | 1 | 3 | |||
Initial Penalty | $1,950 | $0 | $0 | $0 | $0 | $1,950 |
Current Penalty | $1,200 | $0 | $0 | $0 | $0 | $1,200 |
FTA Amount | $0 | $0 | $0 | $0 | $0 | $0 |
Violation Items | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
# | ID | Type | Standard | Issuance | Abate | Curr$ | Init$ | Fta$ | Contest | LastEvent | |
1. | 01001A | Serious | 19260451 B01 | 02/21/2003 | 04/09/2003 | $1,000 | $1,500 | $0 | I - Informal Settlement | ||
2. | 01001B | Serious | 19260451 G01 | 02/21/2003 | 02/26/2003 | $0 | $0 | $0 | I - Informal Settlement | ||
3. | 01002 | Serious | 19260451 E01 | 02/21/2003 | 02/26/2003 | $200 | $450 | $0 | I - Informal Settlement | ||
4. | 02001 | Other | 19101200 E01 | 02/21/2003 | 04/09/2003 | $0 | $0 | $0 | I - Informal Settlement |
Accident Investigation Summary | ||||||
Summary Nr: 201342649 | Event: 09/13/2002 | Two Employees Are Burned In Distillery Explosion | ||||
On September 13, 2002, Employees #1 and #2 were working in the vicinity of the A-still when it was started. One of the manhole covers in the absorption column was apparently open and flammable alcohol vapors escaped and exploded in flame. Employees #1 and #2 both sustained burns, for which they were hospitalized. Previously, the absorption column had been opened to inspect the corn grits process and apparently one of the manholes had not been closed. No lockout and tagout procedures were used when the absorption column was opened, and there was no verification process in place to ensure that all the manhole covers were closed before the still was activated. | ||||||
Keywords: cover, flammable vapors, work rules, explosion, burn, alcohol, fire, lockout | ||||||
Inspection | Degree | Nature | Occupation | |||
---|---|---|---|---|---|---|
1 | 305030207 | Hospitalized injury | Burn(Chemical) | Welders and cutters |