Inspection: 303907802 - Texas Electric Utility Construction, Inc.

Inspection Information - Office: Dallas Area Office

 

Inspection Nr: 303907802
Report ID: 0626300
Date Opened: 12/20/2000

Site Address:
Texas Electric Utility Construction, Inc.
Fm349 I/4 Mile So Of Fm2011
Longview, TX 75501

Mailing Address:
4613 Hwy 1417 N, Sherman, TX 75091

Union Status: NonUnion

SIC:1731

NAICS: 238210/Electrical Contractors


Inspection Type: Accident

Scope: Partial

Advanced Notice: N

Ownership: Private

Safety/Health: Safety

Close Conference: 12/20/2000

Planning Guide: Safety-Construction

Emphasis:

Case Closed: 04/11/2003


Related Activity
Type Activity Nr Safety Health
Accident 100781574
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 1 1
Current Violations
Initial Penalty $6,300 $0 $0 $0 $0 $6,300
Current Penalty $0 $0 $0 $0 $0 $0
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Serious 19100269 M03 IV 06/01/2001 06/06/2001 $0 $6,300 $0 06/08/2001 F - Formal Settlement Citation has been deleted.

Investigation Summary

Investigation Nr: 200781664
Event: 12/19/2000
Electric Shock - Direct Contact with Overhead Line

Two apprentice power line workers employed by an electrical contractor were working under the supervision of a power line supervisor employed by an electric utility. The crew was restoring power after an outage caused by an ice storm. The crew went to the location of the disconnect for the line they were going to work on. They found that disconnect was already open. A crew working for another electric utility had opened it earlier. The employees did not, however, tag the disconnect. The supervisor sent the two apprentices to work on a broken insulator that was about 0.8 kilometers from the disconnect. The supervisor received a message via walkie-talkie from the crew that had opened the disconnect. That crew reported that all employees were clear of the power line. The supervisor reenergized the line. One of the apprentices on the first crew was working from an aerial lift, repairing the broken insulator. He was electrocuted when the supervisor reenergized the 7200-volt overhead power line.

Keywords: OVERHEAD POWER LINE, ELECTRICAL, POWER LINE WORKER, ELECTROCUTED, LOCKOUT, E PTD, ELEC UTILITY WORK, AERIAL LIFT

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 303907802 Fatality Electric Shock Electrical power installers and repairers
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.