Inspection Detail
Inspection: 303129811 - Under Construction Inc
Inspection Information - Office: Or-E-Portland - Safety 1 1054111
Site Address:
Under Construction Inc
1300 Kaster Rd
St Helens, OR 97051
Mailing Address:
Po Box 159, St Helens, OR 97051
Union Status: NonUnion
SIC:1751
NAICS: 0
Inspection Type: Complaint
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Health
Close Conference: 02/08/2000
Planning Guide: Health-Manufacturing
Emphasis:
Case Closed: 10/02/2000
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Complaint | 203073275 | Yes |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 3 | 1 | 4 | |||
| Current Violations | 3 | 1 | 4 | |||
| Initial Penalty | $1,300 | $0 | $0 | $0 | $0 | $1,300 |
| Current Penalty | $1,300 | $0 | $0 | $0 | $0 | $1,300 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001A | Serious | 702012302 | 03/30/2000 | 04/16/2000 | $500 | $500 | $0 | - | ||
| 2. | 01001B | Serious | 19100132 D01 | 03/30/2000 | 04/16/2000 | $0 | $0 | $0 | - | ||
| 3. | 01002 | Serious | 19101200 H01 | 03/30/2000 | 04/16/2000 | $300 | $300 | $0 | - | ||
| 4. | 01003 | Serious | 701076502 A | 03/30/2000 | 04/23/2000 | $500 | $500 | $0 | - | ||
| 5. | 02004 | Other | 701070501 | 03/30/2000 | 04/09/2000 | $0 | $0 | $0 | - |
Investigation Summary
Employee #1 and some coworkers were shoveling slurry from the laundry ring into the primary clarifier. The slurry had a pH of approximately 9.9. The laundry ring is an elevated ring, like a trough, encircling a large holding tank. The tank is called the primary clarifier. The primary clarifier separates the solid sludge from the liquids. All of the effluent pipes at this facility are pumped into the clarifier for separation. A breach was discovered leaking from the primary clarifier. Employee #1 suffered chemical burns on the lower extremities and was hospitalized.
Keywords: LEAK, MAINTENANCE, CHEMICAL BURN, SLUDGE, CHEMICAL, LEG
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 303129811 | Hospitalized injury | Burn(Chemical) | Helpers, construction trades |