Inspection: 302757125 - The Coleman Company, Inc.

Inspection Information - Office: Wichita Area Office

 

Inspection Nr: 302757125
Report ID: 0729700
Date Opened: 11/22/1999

Site Address:
The Coleman Company, Inc.
5605 N. 119th W.
Maize, KS 67101

Mailing Address:
P.O. Box 2931, Wichita, KS 67201

Union Status: NonUnion

SIC:3499

NAICS: 0 


Inspection Type: Accident

Scope: Partial

Advanced Notice: N

Ownership: Private

Safety/Health: Safety

Close Conference: 05/16/2000

Emphasis:

Case Closed: 09/25/2000


Related Activity
Type Activity Nr Safety Health
Accident 101341212
Referral 201341443 Yes
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 11 2 13
Current Violations 11 2 13
Initial Penalty $56,700 $0 $0 $0 $0 $56,700
Current Penalty $49,500 $0 $0 $0 $0 $49,500
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Serious 19100119 C01 05/16/2000 06/18/2000 $4,500 $4,500 $0 I - Informal Settlement  
2. 01002 Serious 19100119 D 05/16/2000 06/18/2000 $4,500 $4,500 $0 I - Informal Settlement  
3. 01003 Serious 19100119 E01 05/16/2000 06/18/2000 $4,500 $4,500 $0 I - Informal Settlement  
4. 01004 Serious 19100119 F01 I 05/16/2000 06/18/2000 $4,500 $4,500 $0 I - Informal Settlement  
5. 01005 Serious 19100119 G01 I 05/16/2000 06/18/2000 $4,500 $6,300 $0 I - Informal Settlement  
6. 01006 Serious 19100119 I01 05/16/2000 06/18/2000 $4,500 $4,500 $0 I - Informal Settlement  
7. 01007A Serious 19100119 J02 05/16/2000 06/18/2000 $4,500 $4,500 $0 I - Informal Settlement  
8. 01007B Serious 19100119 J03 05/16/2000 06/18/2000 $0 $0 $0 I - Informal Settlement  
9. 01007C Serious 19100119 J05 05/16/2000 06/18/2000 $0 $0 $0 I - Informal Settlement  
10. 01008 Serious 19100119 M01 05/16/2000 06/18/2000 $4,500 $6,300 $0 I - Informal Settlement  
11. 01009A Serious 19100120 Q02 II 05/16/2000 09/18/2000 $4,500 $6,300 $0 I - Informal Settlement  
12. 01009B Serious 19100120 Q02 III 05/16/2000 09/18/2000 $0 $0 $0 I - Informal Settlement  
13. 01009C Serious 19100120 Q02 XI 05/16/2000 09/18/2000 $0 $0 $0 I - Informal Settlement  
14. 01010 Serious 19100120 Q06 05/16/2000 09/18/2000 $4,500 $4,500 $0 I - Informal Settlement  
15. 01011 Serious 19100307 B 05/16/2000 06/18/2000 $4,500 $6,300 $0 I - Informal Settlement  
16. 02001 Other 19100120 Q02 I 05/16/2000 06/18/2000 $0 $0 $0 I - Informal Settlement  
17. 02002 Other 19100120 Q02 IV 05/16/2000 06/18/2000 $0 $0 $0 I - Informal Settlement  

Investigation Summary

Investigation Nr: 201340965
Event: 11/21/1999
Three employees burned when plant explodes

At approximately 1:00 a.m. on November 22, 1999, employees working on the propane bottling fill line of a metal fabricating company noticed a ruptured hose leaking on one of the two propane bottling fill machines. One of the employees paged maintenance to report the leak; however, he got no response. He attempted a second page and an employee from maintenance reported to the fill room area. The propane bottling fill line was shut down and Employee #1 (the maintenance worker) and Employee #2 (a lead assembly worker) entered into the fill room to shut off the propane line to the fill machine. Employee #1 accessed the shut off valve using a stepladder that was in the fill room. Employee #2 opened two doors to the outside of the building to let fresh air into the room. Employee #1 then left the fill room to start up the second fill machine to keep production going while he attempted to make repairs of the ruptured propane fill line on the propane bottling fill machine. He then went back into the room along with Employee #2. While inspecting the propane boost pump, Employee #1 reported he saw what he believed to be a blue flame adjacent to the boost pump. The next thing Employee #1 recalled was an explosion with fire. The explosion and fire consumed the propane bottling fill room, the rework area (adjacent to the fill room), the assembly line corridor, and the final bath area where it ignited approximately 47 propane cylinders that were set aside because they leaked. Employee #1 (the maintenance worker), and two assembly workers (Employees #2 and #3) all sustained first-, second-, and third-degree burns to their faces arms and chests. All three employees were transported to hospital and admitted for treatment. One other worker was injured, but no treatment was required.

Keywords: BURN, MAINTENANCE, CYLINDER, INADEQUATE MAINT, METAL SHOP, FIRE, EXPLOSION, PROPANE, PROCESS SAFETY, UNTRAINED

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 302757125 Hospitalized injury Burn/Scald(Heat) Occupation not reported
2 302757125 Hospitalized injury Burn/Scald(Heat) Occupation not reported
3 302757125 Hospitalized injury Burn/Scald(Heat) Occupation not reported
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.