Powered by GoogleTranslate

Inspection Detail

Inspection: 301957643 - Sierra Chemical Co.

Inspection Information - Office: Nv-E-Reno 0953210

 

Inspection Nr: 301957643
Report ID: 0953210
Date Opened: 01/07/1998

Site Address:
Sierra Chemical Co.
Mustang Facility, Kean Canyon
Sparks, NV 89434

Mailing Address:
2302 Larkin Circle, Sparks, NV 89431

Union Status: NonUnion

SIC:2892

NAICS: 0 


Inspection Type: Accident

Scope: Complete

Advanced Notice: N

Ownership: Private

Safety/Health: Health

Close Conference: 04/17/1998

Planning Guide: Health-Manufacturing

Emphasis: L:Psmpqv

Case Closed: 06/06/2000


Related Activity
Type Activity Nr Safety Health
Accident 360242572
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 35 3 38
Current Violations 35 3 38
Initial Penalty $73,500 $147,000 $0 $0 $0 $220,500
Current Penalty $73,500 $147,000 $0 $0 $0 $220,500
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001A Willful 19100119 F01 05/05/1998 05/08/1998 $49,000 $49,000 $0 05/26/1998 -  
2. 01001B Willful 19100119 F01 ID 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 -  
3. 01001C Willful 19100119 F02 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 -  
4. 01001D Willful 19100119 F01 IF 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 -  
5. 01001E Willful 19100119 F03 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 -  
6. 01002 Willful 19100119 I02 II 05/05/1998 05/08/1998 $49,000 $49,000 $0 05/26/1998 -  
7. 01003 Willful 19100119 I02 III 05/05/1998 05/08/1998 $49,000 $49,000 $0 05/26/1998 -  
8. 01004A Serious 19100119 G03 05/05/1998 05/08/1998 $7,000 $7,000 $0 05/26/1998 L - State Settlement  
9. 01004B Serious 19100119 G01 I 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 L - State Settlement  
10. 01005A Serious 19100119 G03 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 L - State Settlement  
11. 01005B Serious 19100119 G01 I 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 L - State Settlement  
12. 01006A Serious 19100119 G03 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 L - State Settlement  
13. 01006B Serious 19100119 G01 I 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 L - State Settlement  
14. 01007A Serious 19100119 G03 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 L - State Settlement  
15. 01007B Serious 19100119 G01 I 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 L - State Settlement  
16. 01008A Serious 19100119 G03 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 L - State Settlement  
17. 01008B Serious 19100119 G01 I 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 L - State Settlement  
18. 01009A Serious 19100119 G03 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 L - State Settlement  
19. 01009B Serious 19100119 G01 I 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 L - State Settlement  
20. 01010A Serious 19100119 G03 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 L - State Settlement  
21. 01010B Serious 19100119 G01 I 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 L - State Settlement  
22. 01011A Serious 19100119 G03 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 L - State Settlement  
23. 01011B Serious 19100119 G01 I 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 L - State Settlement  
24. 01012A Serious 19100119 G03 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 L - State Settlement  
25. 01012B Serious 19100119 G01 I 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 L - State Settlement  
26. 01013A Serious 19100119 G03 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 L - State Settlement  
27. 01013B Serious 19100119 G01 I 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 L - State Settlement  
28. 01014A Serious 19100119 G03 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 L - State Settlement  
29. 01014B Serious 19100119 G01 I 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 L - State Settlement  
30. 01015A Serious 19100119 G03 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 L - State Settlement  
31. 01015B Serious 19100119 G01 I 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 L - State Settlement  
32. 01016A Serious 19100119 G03 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 L - State Settlement  
33. 01016B Serious 19100119 G01 I 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 L - State Settlement  
34. 01017A Serious 19100119 G03 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 L - State Settlement  
35. 01017B Serious 19100119 G01 I 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 L - State Settlement  
36. 01018A Serious 19100119 G03 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 L - State Settlement  
37. 01018B Serious 19100119 G01 I 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 L - State Settlement  
38. 01019A Serious 19100119 G03 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 L - State Settlement  
39. 01019B Serious 19100119 G01 I 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 L - State Settlement  
40. 02001A Serious 19100119 C01 05/05/1998 05/08/1998 $3,500 $3,500 $0 05/26/1998 -  
41. 02001B Serious 19100119 C02 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 -  
42. 02001C Serious 19100119 C03 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 -  
43. 02002A Serious 19100119 D01 I 05/05/1998 05/08/1998 $3,500 $3,500 $0 05/26/1998 -  
44. 02002B Serious 19100119 D01 III 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 -  
45. 02002C Serious 19100119 D03 I 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 -  
46. 02002D Serious 19100119 D03 IF 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 -  
47. 02003 Serious 19100119 D02 IC 05/05/1998 05/08/1998 $3,500 $3,500 $0 05/26/1998 -  
48. 02004 Serious 19100119 D03 II 05/05/1998 05/08/1998 $3,500 $3,500 $0 05/26/1998 -  
49. 02005 Serious 19100119 E03 I 05/05/1998 05/08/1998 $3,500 $3,500 $0 05/26/1998 -  
50. 02006 Serious 19100119 E03 III 05/05/1998 05/08/1998 $3,500 $3,500 $0 05/26/1998 -  
51. 02007 Serious 19100119 E03 IV 05/05/1998 05/08/1998 $3,500 $3,500 $0 05/26/1998 -  
52. 02008 Serious 19100119 E03 V 05/05/1998 05/08/1998 $3,500 $3,500 $0 05/26/1998 -  
53. 02009 Serious 19100119 E03 VI 05/05/1998 05/08/1998 $3,500 $3,500 $0 05/26/1998 -  
54. 02010 Serious 19100119 E04 05/05/1998 05/08/1998 $3,500 $3,500 $0 05/26/1998 -  
55. 02011 Serious 19100119 E05 05/05/1998 05/08/1998 $3,500 $3,500 $0 05/26/1998 -  
56. 02012 Serious 19100119 J02 05/05/1998 05/08/1998 $3,500 $3,500 $0 05/26/1998 -  
57. 02013 Serious 19100119 J04 IV 05/05/1998 05/08/1998 $3,500 $3,500 $0 05/26/1998 -  
58. 02014 Serious 19100119 L01 05/05/1998 05/08/1998 $3,500 $3,500 $0 05/26/1998 -  
59. 02015 Serious 19100119 L03 05/05/1998 05/08/1998 $3,500 $3,500 $0 05/26/1998 -  
60. 02016 Serious 19100119 L05 05/05/1998 05/08/1998 $3,500 $3,500 $0 05/26/1998 -  
61. 02017 Serious 19100119 M01 05/05/1998 05/08/1998 $3,500 $3,500 $0 05/26/1998 -  
62. 02018A Serious 19100132 D01 I 05/05/1998 05/08/1998 $3,500 $3,500 $0 05/26/1998 -  
63. 02018B Serious 19100132 D02 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 -  
64. 02019A Serious 19101200 G02 IC1 05/05/1998 05/08/1998 $3,500 $3,500 $0 05/26/1998 -  
65. 02019B Serious 19101200 G02 IV 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 -  
66. 02019C Serious 19101200 G02 V 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 -  
67. 02019D Serious 19101200 G02 VI 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 -  
68. 02019E Serious 19101200 G02 VIII 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 -  
69. 02019F Serious 19101200 G02 XI 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 -  
70. 02019G Serious 19101200 G02 XII 05/05/1998 05/08/1998 $0 $0 $0 05/26/1998 -  

Investigation Summary

Investigation Nr: 170707624
Event: 01/07/1998
Four employees killed in explosions at manufacturing plant

At 7:54 a.m. on January 7, 1998, Employees #1 through #4 were about to begin work in the production room at Sierra Chemical's Kean Canyon explosives manufacturing facility when two large blasts involving over 40,000 lb of explosives rocked the facility. All four workers were killed. The facility melted, mixed, and poured cast boosters in two separate production areas using large stainless steel steam-and-hot-water-heated melting and mixing kettles. The production room had been in service for less than four months and had several substantial changes compared to the old production area, including kettles heated by steam as opposed to hot water and direct drive mechanical agitation instead of hydraulic agitation. Possible causes of the explosions include raw material contamination, a cold start, or static ignition.

Keywords: AIR PRESSURE, STATIC ELECTRICITY, EXPLOSIVES, EXPLOSIVE MIXING, EXPLOSION, HIGH PRESSURE

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 301957643 Fatality Concussion Miscellaneous plant and system operators
2 301957643 Fatality Concussion Miscellaneous plant and system operators
3 301957643 Fatality Concussion Miscellaneous plant and system operators
4 301957643 Fatality Concussion Miscellaneous plant and system operators
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.

Close