Powered by GoogleTranslate

Inspection Detail

Inspection: 300571171 - Madison Gas And Electric Company

Inspection Information - Office: Madison Area Office

 

Inspection Nr: 300571171
Report ID: 0523300
Date Opened: 05/22/2000

Site Address:
Madison Gas And Electric Company
717 E. Main Street
Madison, WI 53703

Mailing Address:
, , 00000

Union Status: Union

SIC:4911

NAICS: 0 


Inspection Type: Referral

Scope: Partial

Advanced Notice: Y

Ownership: Private

Safety/Health: Safety

Close Conference: 07/13/2000

Emphasis:

Case Closed: 07/14/2000


Related Activity
Type Activity Nr Safety Health
Referral 200800795 Yes

Investigation Summary

Investigation Nr: 200800324
Event: 05/22/2000
Employees injjured in hydrogen explosion

Employee #1 was training Employee #2 as a turbine operator at an electric power generation plant. The turbines the employees were working with were cooled by hydrogen. The system circulated oil to cool the bearings on the turbine, and the oil pressure was designed to prevent hydrogen from flowing into the oil filtering system. Three pumps maintained oil pressure. Two of them were electric pumps; the backup pump was steam powered. The 480-volt circuits supplying power to one section of the plant opened, which caused one of the boilers to shut down. In response, the two employees initiated shut down procedures for the associated turbine (turbine #6). Employee #1 noticed that steam was going into an area that could damage the system. Employees #1 and #2 closed the closest steam valve, which was a main line to the area, and then went to shut off steam to the individual pumps where they suspected that damage could occur. As they were returning to turbine #6, they were called to help shut down turbine #5. After a short time helping on that job, they returned to finish the shutdown of turbine #6. Another operator noticed the lack of oil pressure and asked Employee #1 about the problem. Employee #1 realized that the 480-volt pumps were not energized. When he had closed the main steam valve, the steam pump had also stopped. The steam was immediately turned on, and oil pressure was restored. Employees #1 and #2 then went down to the oil tank and filter to close some valves and prevent oil from overflowing. Because oil pressure had been lost for a period, hydrogen had flowed into this tank. While the employees were closing the valves, the hydrogen ignited, causing an explosion. Employees #1 and #2 received minor injuries. The explosion blew the cover off the oil filter tank, and the flying cover damaged some utilities on the ceiling. The turbine was also damaged from the lack of oil.

Keywords: BURN, HYDROGEN, EXPLOSION, ELEC UTILITY WORK, OVERHEATED, PROCESS SAFETY, CONTUSION

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 300571171 Non Hospitalized injury Bruise/Contus/Abras Power plant operators
2 300571171 Non Hospitalized injury Burn/Scald(Heat) Power plant operators
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.