Inspection: 300330594 - Akzo Nobel Functional Chemicals Llc

Inspection Information - Office: Mobile Area Office

 

Inspection Nr: 300330594
Report ID: 0418600
Date Opened: 12/10/1997

Site Address:
Akzo Nobel Functional Chemicals Llc
13440 Hwy 43 North
Axis, AL 36505

Mailing Address:
P.O.Box 100, Axis, AL 36505

Union Status: Union

SIC:2819

NAICS: 0 


Inspection Type: Accident

Scope: Partial

Advanced Notice: N

Ownership: Private

Safety/Health: Safety

Close Conference: 02/15/1998

Emphasis: N:Psmpqv

Case Closed: 06/10/1999


Related Activity
Type Activity Nr Safety Health
Accident 100450352
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 4 3 7
Current Violations 1 1
Initial Penalty $6,375 $0 $0 $0 $0 $6,375
Current Penalty $0 $0 $0 $0 $0 $0
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Serious 19100119 E01 04/13/1998 04/16/1998 $1,875 $1,875 $0 05/01/1998 F - Formal Settlement Citation has been deleted.
2. 01002 Serious 19100119 E05 04/13/1998 04/20/1998 $1,500 $1,500 $0 05/01/1998 F - Formal Settlement Citation has been deleted.
3. 01003 Serious 19100119 F01 04/13/1998 04/16/1998 $1,875 $1,875 $0 05/01/1998 F - Formal Settlement Citation has been deleted.
4. 01004 Serious 19100119 K02 04/13/1998 04/20/1998 $1,125 $1,125 $0 05/01/1998 F - Formal Settlement Citation has been deleted.
5. 02001 Other 19100119 L01 04/13/1998 04/20/1998 $0 $0 $0 05/01/1998 F - Formal Settlement Citation has been deleted.
6. 02002 Other 19100147 C04 I 04/13/1998 06/01/1999 $0 $0 $0 05/01/1998 F - Formal Settlement  
7. 02003 Other 19100253 B04 III 04/13/1998 04/16/1998 $0 $0 $0 05/01/1998 F - Formal Settlement Citation has been deleted.

Investigation Summary

Investigation Nr: 200450781
Event: 12/09/1997
Three employees burned in explosion and fire at drying unit

On December 9, 1997, an explosion occurred at a drying unit, followed by a flash fire. Employees #1 through #3 sustained burns and were hospitalized overnight.

Keywords: BURN, FLAMMABLE LIQUID, FLAMMABLE VAPORS, FIRE, EXPLOSION, CHEMICAL BURN, CHEMICAL

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 300330594 Hospitalized injury Burn(Chemical) Occupation not reported
2 300330594 Hospitalized injury Burn(Chemical) Occupation not reported
3 300330594 Hospitalized injury Burn(Chemical) Occupation not reported
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.