Inspection Detail
Case Status: PENALTY PAYMENT PLAN IN PLACE |
Note: The following inspection has not been indicated as closed. Please be aware that the information shown may change, e.g. violations may be added or deleted. For open cases, in which a citation has been issued, the citation information may not be available for 5 days following receipt by the employer for Federal inspections or for 30 days following receipt by the employer for State inspections.
Inspection Information - Office: Houston South | ||||
---|---|---|---|---|
Nr: 1389906.015 | Report ID: 0626700 | Open Date: 03/29/2019 | ||
South Texas Illumination Llc | ||||
W Fwy Blvd S - I-10 Feeder Eastboundat S. Peacock St. Vidor, TX 77662 | Union Status: NonUnion | |||
SIC: | ||||
NAICS: 237310/ Highway, Street, and Bridge Construction | ||||
Mailing: 14308 State Highway 155 N, Winona, TX 75792 | ||||
Inspection Type: | Fat/Cat | |||
Scope: | Partial | Advanced Notice: | N | |
Ownership: | Private | |||
Safety/Health: | Safety | Close Conference: | 03/29/2019 | |
Close Case: | ||||
Related Activity: | Type | ID | Safety | Health |
Accident | 1441014 |
Case Status: PENALTY PAYMENT PLAN IN PLACE |
Violation Summary | ||||||
---|---|---|---|---|---|---|
Serious | Willful | Repeat | Other | Unclass | Total | |
Initial Violations | 3 | 2 | 5 | |||
Current Violations | 3 | 2 | 5 | |||
Initial Penalty | $23,868 | $0 | $0 | $1,488 | $0 | $25,356 |
Current Penalty | $14,321 | $0 | $0 | $893 | $0 | $15,214 |
FTA Amount | $0 | $0 | $0 | $0 | $0 | $0 |
Violation Items | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
# | ID | Type | Standard | Issuance | Abate | Curr$ | Init$ | Fta$ | Contest | LastEvent | |
1. | 01001 | Serious | 19260251 E08 | 07/23/2019 | 08/23/2019 | $3,182 | $5,304 | $0 | I - Informal Settlement | ||
2. | 01002A | Serious | 19261408 A01 | 07/23/2019 | 08/23/2019 | $5,569 | $9,282 | $0 | I - Informal Settlement | ||
3. | 01002B | Serious | 19261408 A02 | 07/23/2019 | 08/23/2019 | $0 | $0 | $0 | I - Informal Settlement | ||
4. | 01002C | Serious | 19261408 A02 III B | 07/23/2019 | 08/23/2019 | $0 | $0 | $0 | I - Informal Settlement | ||
5. | 01003 | Serious | 19261427 A02 | 07/23/2019 | 08/23/2019 | $5,569 | $9,282 | $0 | I - Informal Settlement | ||
6. | 02001 | Other | 19261412 E03 I | 07/23/2019 | 08/23/2019 | $446 | $744 | $0 | I - Informal Settlement | ||
7. | 02002 | Other | 19261412 F02 | 07/23/2019 | $446 | $744 | $0 | I - Informal Settlement |
Accident Investigation Summary | ||||||
Summary Nr: 114976.015 | Event: 03/28/2019 | Employee Is Electrocuted When Boom Contacts Power Line | ||||
At 5:10 p.m. on March 28, 2019, an employee was working on a crew that was tasked with pouring a cement foundation for high mast light poles. The employee was standing/sitting on the rear of a boom truck as the boom truck operator removed a 41.83 foot tremie pipe used to pour the cement. As the pipe was laid on the ground, the boom contacted a 7,620 Volt overhead power line. The boom truck was energized and the employee was electrocuted. | ||||||
Keywords: boom, construction, overhead power line, electrocuted | ||||||
Inspection | Degree | Nature | Occupation | |||
---|---|---|---|---|---|---|
1 | 1389906.015 | Fatality | Electric Shock | Construction laborers |