Inspection: 1304658 - Romanoff Electric Corp

Inspection Information - Office: Toledo Area Office

 

Inspection Nr: 1304658
Report ID: 0524700
Date Opened: 07/11/1984

Site Address:
Romanoff Electric Corp
8000 Chrysler Drive
Perrysburg, OH 43551

Mailing Address:
5055 Enterprise Blvd, Toledo, OH 43612

Union Status: Union

SIC:1731

NAICS: 0 


Inspection Type: Complaint

Scope: Partial

Advanced Notice: N

Ownership: Private

Safety/Health: Safety

Close Conference: 08/01/1984

Planning Guide: Safety-Construction

Emphasis:

Case Closed: 02/19/1985


Related Activity
Type Activity Nr Safety Health
Complaint 70659040 Yes
Referral 900506866 Yes
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 1 1 2
Current Violations 1 1 2
Initial Penalty $350 $0 $0 $0 $0 $350
Current Penalty $0 $0 $0 $0 $0 $0
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001A Serious 19260950 D01 IIA 08/14/1984 08/17/1984 $0 $350 $0 09/06/1984 F - Formal Settlement  
2. 01001B Serious 19260950 D01 IV 08/14/1984 08/17/1984 $0 $0 $0 09/06/1984 F - Formal Settlement  
3. 02001 Other 19040002 A 08/14/1984 09/05/1984 $0 $0 $0 F - Formal Settlement  

Investigation Summary

Investigation Nr: 14513881
Event: 07/11/1984
ELECTRIC SHOCK AND BURNS - DIRECT CONTACT WITH LIVE PARTS

EMPLOYEES OF AN ELECTRICAL CONTRACTOR WERE PERFORMING WORK AS PART OF A CONTRACT TO REPLACE A BURNED-OUT SWITCHGEAR IN A SUBSTATION ON THE ROOF OF AN AUTOMOTIVE MANUFACTURING PLANT. THE SWITCH HAD BEEN REPLACED ON FRIDAY, AND TWO WORKERS RETURNED ON SUNDAY MORNING TO HOOK UP THE FEEDERS (13.2 KILOVOLT, 3 PHASE) TO THE BACK OF THE SWITCH PANEL. THEY CHECKED THE TWO SWITCH PANELS WITH AN INSTRUMENT (TIF #300HV TIC-TRACER) AND GOT A CURRENT READING. THE TWO WORKERS WENT WITH PLANT MAINTENANCE PERSONNEL TO THE MAIN SUBSTATION, AND THE MAINTENANCE CREW RACKED OPEN TWO BREAKERS. EMPLOYEES #1 AND #2 VISIBLY CHECKED THIS, THEN PLACED THEIR LOCKS ON THEM AND RETURNED TO THE FIRST SUBSTATION. THEY RECHECKED THE LINES WITH THE TIC-TRACER AND GOT NO READING. THEY PROCEEDED TO UNWRAP THE TAPE FROM THE THREE PHASES IN THE BACK OF THE PANEL. THE BARED CONDUCTORS ARCED, BURNING AND SHOCKING BOTH WORKERS. THE FEEDERS WERE ENERGIZED BY VOLTAGE BACKFEED FROM ANOTHER FEEDER, UNTIL ITS BREAKER OPENED BECAUSE OF THE FAULT CURRENT.

Keywords: BURN, VOLTAGE BACKFEED, ELECTRICAL, LOCKOUT, E PTD, SUBSTATION, ELEC UTILITY WORK, ELECTRIC CONDUCTOR, ELECTRIC SHOCK

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 1304658 Hospitalized injury Burn/Scald(Heat) Electrical power installers and repairers
2 1304658 Hospitalized injury Burn/Scald(Heat) Electrical power installers and repairers
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.