Inspection: 125873166 - Ormesa Llc

Inspection Information - Office: Ca San Diego

Nr: 125873166Report ID: 0950632Open Date: 11/28/2005

Ormesa Llc
3300 East Hewes Hwy
Holtville, CA 92250
Union Status: NonUnion
SIC: 1781/Water Well Drilling
NAICS: 237110/Water and Sewer Line and Related Structures Construction
Mailing: Po Box 86, Holtville, CA 92250

Inspection Type:Accident
Scope:Partial Advanced Notice:N
Ownership:Private
Safety/Health:Safety Close Conference:02/14/2006
Close Case:03/13/2009

Related Activity:TypeIDSafetyHealth
 Accident362425266    

Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 2 3 5
Current Violations 2 3 5
Initial Penalty $21,375 $0 $0 $935 $0 $22,310
Current Penalty $18,270 $0 $0 $600 $0 $18,870
FTA Amount $0 $0 $0 $0 $0 $0

Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
  1. 01001 Other 461 C 02/15/2006 04/04/2006 $300 $375 $0 I - Informal Settlement
  2. 01002 Other 1509 A 02/15/2006 04/04/2006 $300 $375 $0 I - Informal Settlement
  3. 01003 Other 1509 B 02/15/2006 04/04/2006 $0 $185 $0 I - Informal Settlement
  4. 02001 Serious 3329 B 02/15/2006 03/02/2006 $270 $3,375 $0 I - Informal Settlement
  5. 03001 Serious 3329 C 02/15/2006 03/02/2006 $18,000 $18,000 $0 I - Informal Settlement

Accident Investigation Summary
Summary Nr: 201069390Event: 11/09/2005Employees Are Burned By Hot Water From Pipeline
At approximately 12:00 noon on September 9, 2005, Employee #1 and #2, both welders, were repairing a leaking 20-in.-diameter carbide steel injection geothermal pipeline. Employee #1 released a come-along (a ratchet-chain puller/hoist) that was securing a temporary metal saddle patch (10 in. by 10 in. by 0.5 in.) covering a previously-repaired leak on the pipeline. The pipeline then ruptured, releasing steam and pressurized hot water (170 degrees Fahrenheit and 380 psi). The release created an 8-ft-deep, 25-ft-diameter crater. Both employees were sprayed with the hot water that escaped from the ruptured pipeline, and were both thrown away from the pipeline. Employee #1 was hospitalized at UCSD Burn Center for third-degree burns to back of his right leg, the left side of his body (from his hip to his armpit), his back, and his stomach. Employee #2 was hospitalized at El Centro Regional Center for burns to his left shoulder and left arm, and contusions to his shoulder and elbow.
Keywords: burn, leak, repair, torso, steam, pipeline, arm, pressure release, hot water, leg
Inspection Degree Nature Occupation
1 125873166 Hospitalized injury Burn/Scald(Heat) Welders and cutters

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.