Inspection Detail
Inspection: 125785949 - Beutler Heating & Air Conditioning
Inspection Information - Office: Sacramento District Office
Site Address:
Beutler Heating & Air Conditioning
Lot 90 Pinto Canyon Way
Roseville, CA 95678
Mailing Address:
4700 Long Drive, Mcclellan, CA 95652
Union Status: NonUnion
SIC:1711
NAICS: 0
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 07/05/2001
Emphasis:
Case Closed: 07/16/2001
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 361709041 |
Investigation Summary
At approximately 9:00 a.m. on January 30, 2001, Employee #1, a heater installer, was installing a gas furnace in the attic area of a two story single family home. To complete the installation Employee #1 had to go out onto the roof to place a section of flue piping. Employee #1 accessed the roof by going out the open end gable, checking the roof for ice; he exited onto a south facing adjoining roof and then went around to the north side of the upper roof. When Employee #1 got near the top he slipped on some ice and slid down and off the roof. Employee #1 fell 20 ft and 5 in. The local fire department provided first aid prior to transporting Employee #1 to an area hospital where he was treated for fractures (hairline) in the back and the neck. Employee #1 was hospitalized.
Keywords: FRACTURE, INSTALLING, ROOF, SLIP, BACK, FALL, NECK
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 125785949 | Hospitalized injury | Fracture | Construction trades, n.e.c. |
Translate