Powered by GoogleTranslate

Inspection Detail

Inspection: 125479402 - Dale Homes Inc.

Inspection Information - Office: American Canyon District Office

 

Inspection Nr: 125479402
Report ID: 0950615
Date Opened: 12/09/2010

Site Address:
Dale Homes Inc.
6250 Bohemian Hwy
Occidental, CA 95465

Mailing Address:
2727 Churn Creek Blvd, Ste A, Redding, CA 96002

Union Status: NonUnion

SIC:1795

NAICS: 238910/Site Preparation Contractors


Inspection Type: Accident

Scope: Partial

Advanced Notice: N

Ownership: Private

Safety/Health: Safety

Close Conference: 06/06/2011

Planning Guide: Safety-Construction

Emphasis: S:Construction (Cship)

Case Closed: 10/06/2022


Related Activity
Type Activity Nr Safety Health
Accident 102647690
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 4 4 8
Current Violations 4 4 8
Initial Penalty $30,600 $0 $0 $1,875 $0 $32,475
Current Penalty $30,600 $0 $0 $1,875 $0 $32,475
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citation Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Other 3203 A07 06/06/2011 06/29/2011 $500 $500 $0 06/27/2011 F - Formal Settlement  
2. 01002 Other 3382 A 06/06/2011 06/09/2011 $375 $375 $0 06/27/2011 F - Formal Settlement  
3. 01003 Other 5158 C01 C 06/06/2011 06/29/2011 $500 $500 $0 06/27/2011 F - Formal Settlement  
4. 01004 Other 5158 E02 A 06/06/2011 06/29/2011 $500 $500 $0 06/27/2011 F - Formal Settlement  
5. 02001 Serious 5158 C02 06/06/2011 06/29/2011 $4,500 $4,500 $0 06/27/2011 F - Formal Settlement  
6. 03001 Serious 5158 D02 06/06/2011 06/09/2011 $10,800 $10,800 $0 06/27/2011 F - Formal Settlement  
7. 04001 Serious 5158 E01 06/06/2011 06/09/2011 $4,500 $4,500 $0 06/27/2011 F - Formal Settlement  
8. 05001 Serious 5158 E01 F 06/06/2011 06/09/2011 $10,800 $10,800 $0 06/27/2011 F - Formal Settlement  

Investigation Summary

Investigation Nr: 201023108
Event: 12/08/2010
Four Employees Are Injured in Explosion in Confined Space

On December 8, 2010, Employees #1, #2, #3 and #4 were working at a multi-employer worksite. Employees #1 and #2 worked for one employer, and Employees #3 and #4 worked for another employer. Employee #1 was assigned the task of demolishing an abandoned septic tank. Employee #1 entered the tank and attempted to break the floor of the tank. An explosion occurred, and Employee #1 was injured in the blast. Employees #2, #3 and #4 were also injured by the blast.

Keywords: DEMOLITION, CONFINED SPACE, IDLH, EXPLOSION, TANK

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 125479402 Hospitalized injury Burn/Scald(Heat) Plumbers, pipefitters and steamfitters
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.

Close