Inspection Detail
Inspection: 120361274 - Abc Rail Corporation-Duluth Panel Plant
Inspection Information - Office: Minnesota Department Of Labor And Industry
Site Address:
Abc Rail Corporation-Duluth Panel Plant
2900 W Michigan St, Bldg.39, Clyde Iron Complex
Duluth, MN 55806
Mailing Address:
P.O. Box 129, Superior, WI 54880
Union Status: NonUnion
SIC:3743
NAICS: 0
Inspection Type: Accident
Scope: Complete
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 06/01/1994
Emphasis:
Case Closed: 10/07/1996
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 360241616 |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 19 | 2 | 7 | 28 | ||
| Current Violations | 19 | 2 | 7 | 28 | ||
| Initial Penalty | $107,550 | $95,000 | $0 | $3,400 | $0 | $205,950 |
| Current Penalty | $50,836 | $47,500 | $0 | $1,664 | $0 | $100,000 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001 | Willful | 19100022 A01 | 08/16/1994 | 08/19/1994 | $12,500 | $25,000 | $0 | 08/26/1994 | F - Formal Settlement | |
| 2. | 01002 | Willful | 19100179 B08 | 08/16/1994 | 08/20/1994 | $35,000 | $70,000 | $0 | 08/26/1994 | F - Formal Settlement | |
| 3. | 02001 | Serious | 19100025 D01 X | 08/16/1994 | 08/19/1994 | $416 | $900 | $0 | 08/26/1994 | F - Formal Settlement | |
| 4. | 02002 | Serious | 19100037 Q01 | 08/16/1994 | 08/20/1994 | $416 | $1,300 | $0 | 08/26/1994 | F - Formal Settlement | |
| 5. | 02003 | Serious | 19100106 D02 I | 08/16/1994 | 08/20/1994 | $416 | $900 | $0 | 08/26/1994 | F - Formal Settlement | |
| 6. | 02004 | Serious | 19100178 L | 08/16/1994 | 08/20/1994 | $416 | $1,900 | $0 | 08/26/1994 | F - Formal Settlement | |
| 7. | 02005 | Serious | 19100184 C09 | 08/16/1994 | 08/19/1994 | $13,825 | $27,650 | $0 | 08/26/1994 | F - Formal Settlement | |
| 8. | 02006 | Serious | 19100179 J02 I | 08/16/1994 | 08/20/1994 | $416 | $2,300 | $0 | 08/26/1994 | F - Formal Settlement | |
| 9. | 02007 | Serious | 19100179 J02 III | 08/16/1994 | 08/20/1994 | $416 | $2,100 | $0 | 08/26/1994 | F - Formal Settlement | |
| 10. | 02008 | Serious | 19100179 L01 | 08/16/1994 | 08/20/1994 | $416 | $2,500 | $0 | 08/26/1994 | F - Formal Settlement | |
| 11. | 02009 | Serious | 19100179 M01 | 08/16/1994 | 08/20/1994 | $416 | $2,100 | $0 | 08/26/1994 | F - Formal Settlement | |
| 12. | 02010 | Serious | 19100184 D | 08/16/1994 | 08/19/1994 | $416 | $1,500 | $0 | 08/26/1994 | F - Formal Settlement | |
| 13. | 02011 | Serious | 19100184 E01 | 08/16/1994 | 08/20/1994 | $416 | $2,300 | $0 | 08/26/1994 | F - Formal Settlement | |
| 14. | 02012 | Serious | 19100303 G02 I | 08/16/1994 | 08/20/1994 | $416 | $1,700 | $0 | 08/26/1994 | F - Formal Settlement | |
| 15. | 02013 | Serious | 19100333 B02 I | 08/16/1994 | 09/18/1994 | $416 | $1,500 | $0 | 08/26/1994 | F - Formal Settlement | |
| 16. | 02014 | Serious | 5205014001 | 08/16/1994 | 08/20/1994 | $416 | $1,500 | $0 | 08/26/1994 | F - Formal Settlement | |
| 17. | 02015 | Serious | 5205120003 | 08/16/1994 | 08/20/1994 | $416 | $2,100 | $0 | 08/26/1994 | F - Formal Settlement | |
| 18. | 02016 | Serious | 5206070001 | 08/16/1994 | 08/20/1994 | $416 | $3,000 | $0 | 08/26/1994 | F - Formal Settlement | |
| 19. | 02017 | Serious | 182065302 | 08/16/1994 | 09/16/1994 | $30,355 | $50,000 | $0 | 08/26/1994 | F - Formal Settlement | |
| 20. | 02018 | Serious | 182065302 | 08/16/1994 | 08/20/1994 | $416 | $2,300 | $0 | 08/26/1994 | F - Formal Settlement | |
| 21. | 02019 | Serious | 182065308 | 08/16/1994 | 02/15/1995 | $0 | $0 | $0 | - | ||
| 22. | 03001 | Other | 19100157 G01 | 08/16/1994 | 08/20/1994 | $416 | $900 | $0 | 08/26/1994 | F - Formal Settlement | |
| 23. | 03002 | Other | 19100178 Q07 | 08/16/1994 | 08/20/1994 | $0 | $0 | $0 | - | ||
| 24. | 03003 | Other | 19100179 B05 | 08/16/1994 | 08/20/1994 | $416 | $750 | $0 | 08/26/1994 | F - Formal Settlement | |
| 25. | 03004 | Other | 19100253 B04 III | 08/16/1994 | 08/20/1994 | $0 | $0 | $0 | - | ||
| 26. | 03005 | Other | 52050710 | 08/16/1994 | 08/19/1994 | $416 | $750 | $0 | 08/26/1994 | F - Formal Settlement | |
| 27. | 03006 | Other | 52100420 | 08/16/1994 | 08/20/1994 | $416 | $1,000 | $0 | 08/26/1994 | F - Formal Settlement | |
| 28. | 03007 | Other | 182065510 A | 08/16/1994 | 09/18/1994 | $0 | $0 | $0 | - |
Investigation Summary
Employee #1, who had been on the job for 1 1/2 months, was operating a 15-ton capacity overhead top running bridge crane with a suspended load of 6 tons. The crane was operated by floor-operated pendant control devices. The load was a railroad switch panel 30 feet long by 12 feet wide. Employee #1 was operating the pendant control crane in a 4 1/2 ft wide aisle between a pile of railroad panels and a railroad gondola. There were tripping hazards on the floor (three steel rails, 4 to 5 gallon drums of loose components, and one chair sling). Employee #1 had lifted the panel from a flat position up to a 30 degree angle when the load shifted, striking and killing him.
Keywords: PANEL, WORK RULES, LOAD SHIFT, OVERHEAD CRANE, STRUCK BY, FALLING OBJECT
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 120361274 | Fatality | Other | Assemblers |