Inspection Detail
Inspection: 120308614 - Warner Brothers
Inspection Information - Office: Long Beach District Office
Site Address:
Warner Brothers
Spruce Goose Dome Pier J
Long Beach, CA 90802
Mailing Address:
4000 Warner Blvd, Burbank, CA 91522
Union Status: Union
SIC:7812
NAICS: 0
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Health
Close Conference: 10/23/2000
Emphasis:
Case Closed: 09/04/2006
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 362431082 |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 2 | 3 | 5 | |||
| Current Violations | 1 | 4 | 5 | |||
| Initial Penalty | $36,000 | $0 | $0 | $1,500 | $0 | $37,500 |
| Current Penalty | $1,800 | $0 | $0 | $2,250 | $0 | $4,050 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001 | Other | 342 A | 10/23/2000 | 10/26/2000 | $375 | $375 | $0 | 12/12/2000 | F - Formal Settlement | |
| 2. | 01002 | Other | 1509 A | 10/23/2000 | 10/26/2000 | $375 | $375 | $0 | 12/12/2000 | F - Formal Settlement | |
| 3. | 01003 | Other | 4848 A19 | 10/23/2000 | 10/26/2000 | $750 | $750 | $0 | 12/12/2000 | F - Formal Settlement | |
| 4. | 02001 | Other | 4848 A10 | 10/23/2000 | 10/26/2000 | $750 | $18,000 | $0 | 12/12/2000 | F - Formal Settlement | |
| 5. | 03001 | Serious | 4848 A20 | 10/23/2000 | 10/26/2000 | $1,800 | $18,000 | $0 | 12/12/2000 | F - Formal Settlement |
Investigation Summary
At approximately 1:30 p.m. on March 31, 2000, discarded pieces from a movie set, containing wood, steel, plaster, and insulation foam, caught on fire within a geodesic dome when sparks and/or hot slag generated from a cutting operation came in contact with them. Upon being alerted of the fire, Employee #1 and several coworkers used fire extinguishers and hoses in an attempt to contain it. The blaze grew too large for the available equipment, and the local fire department was notified. On arriving at the dome, the fire fighters provided first aid to the workers, including Employee #1, who was suffering from respiratory distress. He returned to work at the dome the following week, but his respiratory problems continued and he could not report to work after April 7. On April 11, 2000, his respiratory problems became so severe that he brought himself to the emergency room at Henry Mayo Hospital, where he was admitted for treatment of chemical pneumonia.
Keywords: RESPIRATORY, FIRE, INHALATION, RESPIRATORY TRACT, SPARK, CHEMICAL VAPOR, SMOKE INHALATION, CHEMICAL, INFECTIOUS DISEASE
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 120308614 | Hospitalized injury | Other | Construction trades, n.e.c. |