Inspection Detail
Inspection: 120115084 - Doon'S Construction
Inspection Information - Office: Long Beach District Office
Site Address:
Doon'S Construction
379 E 228th St
Carson, CA 90745
Mailing Address:
6218 Silva St, Lakewood, CA 90713
Union Status: NonUnion
SIC:1521
NAICS: 0
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Health
Close Conference: 08/04/1993
Planning Guide: Health-Construction
Emphasis:
Case Closed: 08/05/1993
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 361293186 |
Investigation Summary
On May 6, 1993, Employee #1 was hired to remove the carpet from a cement floor in Carson, CA. On May 7, Employee #1 completed the removal of the rug and started removing the remaining glue by applying gasoline to the cement floor, which softened the glue and enabled Employee #1 to easily wipe it off the floor. While dispersing the gasoline throughout the living room with a broom, he inadvertantly dispersed gasoline into the gas heater. The gasoline hit the pilot light, ignited, and flashed to the broom and to the house, trapping Employee #1. Employee #1 was rescued by the L.A. County Fire Department and was sent to Torrance Memorial Burn Center.
Keywords: BURN, PILOT LIGHT, HEATER, WORK RULES, FIRE, CONSTRUCTION, GASOLINE
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 120115084 | Hospitalized injury | Burn/Scald(Heat) | Construction trades, n.e.c. |
Translate