Powered by GoogleTranslate

Inspection Detail

Inspection: 111829065 - East Bay Steel Products, Inc.

Inspection Information - Office: Oakland District Office

 

Inspection Nr: 111829065
Report ID: 0950614
Date Opened: 05/21/1991

Site Address:
East Bay Steel Products, Inc.
900 Murray St.
Berkeley, CA 94710

Mailing Address:
P.O.Box 23711, Oakland, CA 94710

Union Status: Union

SIC:3498

NAICS: 0 


Inspection Type: Accident

Scope: Complete

Advanced Notice: N

Ownership: Private

Safety/Health: Safety

Close Conference: 06/07/1991

Planning Guide: Safety-Manufacturing

Emphasis:

Case Closed: 04/02/1992


Related Activity
Type Activity Nr Safety Health
Accident 361041486
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 4 34 38
Current Violations 3 32 35
Initial Penalty $1,664 $0 $0 $890 $0 $2,554
Current Penalty $614 $0 $0 $825 $0 $1,439
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Other 23400023 06/07/1991 07/08/1991 $0 $0 $0 -  
2. 01002 Other 3203 A 06/07/1991 07/08/1991 $75 $75 $0 07/05/1991 W - Empr Withdrew  
3. 01003 Other 3273 A 06/07/1991 07/08/1991 $0 $0 $0 -  
4. 01004 Other 3308 06/07/1991 07/08/1991 $0 $0 $0 -  
5. 01005 Other 3328 G 06/07/1991 06/21/1991 $75 $75 $0 07/05/1991 W - Empr Withdrew  
6. 01006 Other 3382 A 06/07/1991 06/14/1991 $0 $0 $0 07/05/1991 W - Empr Withdrew  
7. 01007 Other 3577 B 06/07/1991 05/22/1991 $55 $55 $0 -  
8. 01008 Other 3660 A 06/07/1991 07/08/1991 $0 $0 $0 -  
9. 01009 Other 4070 A 06/07/1991 06/10/1991 $35 $35 $0 -  
10. 01010 Other 4310 A01 06/07/1991 06/10/1991 $35 $35 $0 07/05/1991 W - Empr Withdrew  
11. 01011 Other 4650 D 06/07/1991 06/21/1991 $35 $35 $0 -  
12. 01012 Other 4889 B 06/07/1991 07/08/1991 $0 $0 $0 -  
13. 01013 Other 5021 A01 06/07/1991 07/08/1991 $35 $35 $0 -  
14. 01014 Other 5144 C 06/07/1991 07/08/1991 $55 $55 $0 07/05/1991 F - Formal Settlement  
15. 01015 Other 5144 D04 06/07/1991 05/29/1991 $0 $0 $0 -  
16. 01016 Other 5144 E03 06/07/1991 07/08/1991 $0 $0 $0 -  
17. 01017 Other 5144 F01 06/07/1991 07/08/1991 $0 $0 $0 -  
18. 01018 Other 5144 F03 06/07/1991 07/08/1991 $0 $0 $0 07/05/1991 W - Empr Withdrew  
19. 01019 Other 5153 B01 06/07/1991 07/08/1991 $35 $35 $0 A - Amendment Citation has been deleted.
20. 01020 Other 5155 E01 06/07/1991 07/08/1991 $55 $55 $0 07/05/1991 F - Formal Settlement  
21. 01021 Other 5162 A 06/07/1991 07/08/1991 $55 $55 $0 -  
22. 01022 Other 5162 B 06/07/1991 07/08/1991 $55 $55 $0 07/05/1991 F - Formal Settlement  
23. 01023 Other 5194 E01 06/07/1991 07/08/1991 $0 $0 $0 -  
24. 01024 Other 5194 E03 06/07/1991 05/29/1991 $0 $0 $0 -  
25. 01025 Other 5194 F04 06/07/1991 07/08/1991 $0 $0 $0 -  
26. 01026 Other 5194 G08 06/07/1991 07/08/1991 $55 $55 $0 -  
27. 01027 Other 5194 H01 06/07/1991 07/08/1991 $75 $75 $0 -  
28. 01028 Other 5545 A01 06/07/1991 06/10/1991 $0 $0 $0 -  
29. 01029 Other 5551 C 06/07/1991 06/14/1991 $35 $35 $0 -  
30. 01030 Other 6151 C01 06/07/1991 06/10/1991 $35 $35 $0 -  
31. 01031 Other 6151 G01 06/07/1991 07/08/1991 $0 $0 $0 -  
32. 01032 Other 461 A 06/07/1991 07/08/1991 $30 $30 $0 A - Amendment Citation has been deleted.
33. 01033 Other 461 C 06/07/1991 07/08/1991 $30 $30 $0 -  
34. 01034 Other 14301 C02 06/07/1991 05/21/1991 $30 $30 $0 -  
35. 02001 Serious 3328 E 06/07/1991 05/21/1991 $14 $14 $0 07/05/1991 F - Formal Settlement  
36. 03001 Serious 3578 G 06/07/1991 06/10/1991 $300 $600 $0 07/05/1991 F - Formal Settlement  
37. 04001 Serious 4206 A 06/07/1991 06/28/1991 $300 $600 $0 07/05/1991 F - Formal Settlement  
38. 05001 Serious 4307 C 06/07/1991 06/10/1991 $450 $450 $0 A - Amendment Citation has been deleted.

Investigation Summary

Investigation Nr: 170208581
Event: 03/15/1991
Employee's leg broken by flying pump hose

At approximately 2:15 p.m. on March 15, 1991, during the repair of a failed pump coil, the Vermiculite mixture that was in the attached hose hardened. When the pump was started, the hardened Vermiculite obstructed the line, and pressure built up until the 2 to 3 in. diameter hose blew off the threaded connector. It struck Employee #1's leg, fracturing it. He was taken by ambulance to Alta Bates Hospital and hospitalized for 3 days for surgery and traction.

Keywords: FRACTURE, REPAIR, HOSE, HIGH PRESSURE, STRUCK BY, FLYING OBJECT, HOUSEKEEPING, PUMP, LEG

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 111829065 Hospitalized injury Fracture Cementing and gluing machine operators
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.

Close