Inspection: 110042512 - T.U. Electric Company

Inspection Information - Office: Fort Worth Area Office

 

Inspection Nr: 110042512
Report ID: 0636900
Date Opened: 08/24/1995

Site Address:
T.U. Electric Company
138 Kv Switching Station
Graham, TX 76450

Mailing Address:
1601 Bryan Street, Dallas, TX 75201

Union Status: NonUnion

SIC:4911

NAICS: 0 


Inspection Type: Accident

Scope: Partial

Advanced Notice: Y

Ownership: Private

Safety/Health: Safety

Close Conference: 09/25/1995

Planning Guide: Safety-Construction

Emphasis:

Case Closed: 09/09/1996


Related Activity
Type Activity Nr Safety Health
Accident 360911671
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 4 4
Current Violations
Initial Penalty $14,850 $0 $0 $0 $0 $14,850
Current Penalty $0 $0 $0 $0 $0 $0
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Serious 19260950 B02 12/14/1995 12/20/1995 $4,500 $4,500 $0 01/04/1996 F - Formal Settlement Citation has been deleted.
2. 01002 Serious 19260950 D01 IV 12/14/1995 12/20/1995 $4,500 $4,500 $0 01/04/1996 F - Formal Settlement Citation has been deleted.
3. 01003A Serious 19260954 E01 12/14/1995 12/20/1995 $4,500 $4,500 $0 01/04/1996 F - Formal Settlement Citation has been deleted.
4. 01003B Serious 19260954 F 12/14/1995 12/20/1995 $0 $0 $0 01/04/1996 F - Formal Settlement Citation has been deleted.
5. 01004 Serious 19261051 A 12/14/1995 12/20/1995 $1,350 $1,350 $0 01/04/1996 F - Formal Settlement Citation has been deleted.

Investigation Summary

Investigation Nr: 566687
Event: 08/24/1995
ELECTRIC SHOCK - DIRECT CONTACT WITH OVERHEAD LINE

A three-person power line crew had a clearance to upgrade the bus and replace an air switch in a 138-kilovolt switching substation. Another crew was about 50 feet away, installing grounding jumpers on the same line. One of the power line workers on the first crew was tied off by a safety belt and a lanyard to a truss that was about 40 feet above the ground. The two other employees were working from a double-bucket aerial lift. The employees were removing a pipe jumper from one phase of the three-phase circuit. One of the employees in the aerial lift removed his end of the jumper, and the employee on the structure was removing the bolt from his end of the jumper. A parallel 345-kilovolt overhead power line induced voltage on the deenergized 138-kilovolt line. When these two employees contacted the last phase conductor, the employee on the structure was electrocuted, and the employee in the aerial lift received an electric shock. The employee in the aerial lift was hospitalized for his injuries.

Keywords: OVERHEAD POWER LINE, PROTECTIVE GROUNDING, ELECTRICAL, POWER LINE WORKER, ELECTROCUTED, E PTD, INDUCED CURRENT, ELEC UTILITY WORK, ELECTRIC SHOCK, AERIAL LIFT

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 110042512 Fatality Electric Shock Electrical power installers and repairers
2 110042512 Hospitalized injury Electric Shock Electrical power installers and repairers
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.