Inspection: 110040383 - Conn & Sons Construction Co., Inc.

Inspection Information - Office: Fort Worth

Nr: 110040383Report ID: 0636900Open Date: 08/21/1998

Conn & Sons Construction Co., Inc.
600 Block Below Ne 28th St.
Fort Worth, TX 76106
Union Status: NonUnion
SIC: 1623/Water, Sewer, Pipeline, and Communications and Power Line Construction
Mailing: 4715 Turner-Wadell, Arlington, TX 76001

Inspection Type:Accident
Scope:Partial Advanced Notice:Y
Ownership:Private
Safety/Health:Health Close Conference:10/22/1998
Close Case:03/15/2000

Related Activity:TypeIDSafetyHealth
 Accident100710508    

Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 3 3 6
Current Violations 1 1 2
Initial Penalty $3,000 $66,000 $0 $0 $0 $69,000
Current Penalty $750 $16,500 $0 $0 $0 $17,250
FTA Amount $0 $0 $0 $0 $0 $0

Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
Deleted 1. 01001 Serious 19260055 A 10/26/1998 10/29/1998 $750 $750 $0 11/16/1998 J - ALJ Decision
Deleted 2. 01002 Serious 19260055 B 10/26/1998 10/29/1998 $750 $750 $0 11/16/1998 J - ALJ Decision
Deleted 3. 02001 Willful 5A0001 10/26/1998 11/20/1998 $16,500 $16,500 $0 11/16/1998 J - ALJ Decision
Deleted 4. 02002 Willful 19260021 B06 I 10/26/1998 11/20/1998 $16,500 $16,500 $0 11/16/1998 J - ALJ Decision
  5. 03001A Serious 19260055 A 10/26/1998 10/29/1998 $750 $750 $0 11/16/1998 J - ALJ Decision
  6. 03001B Serious 19260055 B 10/26/1998 10/29/1998 $0 $750 $0 11/16/1998 J - ALJ Decision
  7. 04001A Willful 5A0001 10/26/1998 11/20/1998 $16,500 $16,500 $0 11/16/1998 J - ALJ Decision
  8. 04001B Willful 19260021 B06 I 10/26/1998 11/20/1998 $0 $16,500 $0 11/16/1998 J - ALJ Decision

Accident Investigation Summary
Summary Nr: 200710630Event: 08/19/1998Two Employees Die Of Exposure To Hydrogen Sulfide
Employees #1 and #2 were part of a construction crew building an extension sewer line that was to tap into an existing city line. The crew had exposed one side of a manhole in the city sewer line and a subcontractor had core-drilled a hole in it for placement of the new line. Some concrete remained intact after the drilling was completed. Employee #1 was lowered into the manhole using a chain draped over a rock bar. He was immediately overcome by the high levels of hydrogen sulfide. Employee #2 attempted to rescue him but was also overcome by the fumes. Both workers were killed.
Keywords: sewer, hydrogen sulfide, construction, inhalation, gas, air contamination, chemical vapor, poisoning, manhole, chemical
Inspection Degree Nature Occupation
1 110040383 Fatality Poisoning(Systemic) Occupation not reported
2 110040383 Fatality Poisoning(Systemic) Occupation not reported

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.