Powered by GoogleTranslate

Inspection Detail

Inspection: 109180059 - Coverflex Manufacturing Inc.

Inspection Information - Office: Bridgeport Area Office

 

Inspection Nr: 109180059
Report ID: 0111500
Date Opened: 02/07/2010

Site Address:
Coverflex Manufacturing Inc.
1349 River Road
Middletown, CT 06450

Mailing Address:
6828 La Paseo St, Houston, TX 77087

Union Status: Union

SIC:1799

NAICS: 238990/All Other Specialty Trade Contractors


Inspection Type: Accident

Scope: Complete

Advanced Notice: N

Ownership: Private

Safety/Health: Safety

Close Conference: 08/02/2010

Emphasis:

Case Closed: 09/06/2011


Related Activity
Type Activity Nr Safety Health
Accident 101521128
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 6 6
Current Violations 2 2
Initial Penalty $42,000 $0 $0 $0 $0 $42,000
Current Penalty $0 $0 $0 $4,000 $0 $4,000
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Serious 19260021 B02 08/03/2010 08/09/2010 $7,000 $7,000 $0 I - Informal Settlement Citation has been deleted.
2. 01002 Other 19260065 Q01 08/03/2010 08/09/2010 $2,000 $7,000 $0 I - Informal Settlement  
3. 01003 Other 19260150 E01 08/03/2010 08/09/2010 $2,000 $7,000 $0 I - Informal Settlement  
4. 01004 Serious 19260150 E02 08/03/2010 08/09/2010 $7,000 $7,000 $0 I - Informal Settlement Citation has been deleted.
5. 01005 Serious 19260352 C 08/03/2010 08/09/2010 $7,000 $7,000 $0 I - Informal Settlement Citation has been deleted.
6. 01006 Serious 19260501 B04 I 08/03/2010 08/09/2010 $7,000 $7,000 $0 I - Informal Settlement Citation has been deleted.

Investigation Summary

Investigation Nr: 201523404
Event: 02/07/2010
Employee Is Injured in Natural Gas Explosion

On February 7, 2010, subcontractors, working as direct subs of O & G Industries, were on site at the 620 MW Combined Cycle Electric Generating Facility, located in Middletown, CT. A natural gas explosion occurred. The project consisted of two Siemens SGT6-5000F dual fuel combustion turbines, one high-pressure Siemens SST-5000 steam turbine, heat recovery steam generators, cooling towers, DCS instrument and control system, and a 345 kV gas-insulated switchyard with step-up transformers. O&G was overseeing all local, state, and federal permitting, engineering, and construction of this project. O&G responsibilities also included the overview of all environmental site engineering for air, noise, water and electrical interconnect; design basis configuration for all mechanical, electrical, and civil/structural engineering; the construction execution plan; cost estimate; and schedule. The nature of the event or injuries was not specified in the original narrative.

Keywords: CONSTRUCTION, NATURAL GAS, GAS, ELECTRIC GENERATOR

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 109180059 Fatality Other Occupation Not Listed
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.

Close