Inspection: 108433335 - Atlantic Restoration & Concrete Construction Inc

Inspection Information - Office: Maryland Region 4

Nr: 108433335Report ID: 0352440Open Date: 10/13/1989

Atlantic Restoration & Concrete Construction Inc
1306 Concourse Drive
Linthicum Heights, MD 21090
Union Status: NonUnion
SIC: 1771/Concrete Work
Mailing: P O Box 1210, Pasadena, MD 21122

Inspection Type:Accident
Scope:Partial Advanced Notice:N
Ownership:Private
Safety/Health:Safety Close Conference:10/26/1989
Planning Guide: Safety-Construction Close Case:03/11/1997

Related Activity:TypeIDSafetyHealth
 Accident360218481    

Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 2 2 4
Current Violations 2 2 4
Initial Penalty $655 $0 $0 $0 $0 $655
Current Penalty $300 $0 $0 $0 $0 $300
FTA Amount $0 $0 $0 $0 $0 $0

Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
  1. 01001A Serious 19260020 B02 11/27/1989 11/30/1989 $250 $555 $0 12/22/1989 W - Empr Withdrew
  2. 01001B Serious 19260021 B02 11/27/1989 11/30/1989 $0 $0 $0 12/22/1989 W - Empr Withdrew
  3. 02001 Serious 890032 M B 11/27/1989 11/30/1989 $50 $100 $0 12/22/1989 W - Empr Withdrew
  4. 03001 Other 890032 E B 11/27/1989 11/30/1989 $0 $0 $0 12/22/1989 W - Empr Withdrew
  5. 03002 Other 890032 H A 11/27/1989 11/30/1989 $0 $0 $0 12/22/1989 W - Empr Withdrew

Accident Investigation Summary
Summary Nr: 744912Event: 10/13/1989Four Employees Injured When Bar Joists Dislodge
On October 13, 1989, a second-level subcontractor and a first-level subcontractor for installing the Hambro D-500 Concrete Floor Roof System were pouring and finishing one wing of the fifth floor on a five-story office building. This wing was 140 ft by 80 ft. The columns and reams for the roof were set dividing the area into two bays and two outside rows of seven bays 20 ft by 30 ft and a center row of seven bays 20 ft by 20 ft. The subcontractors were using a concrete pump truck with boom and hose from above. Before the pour started, the other second-level subcontractors, ironworkers, had set all the roof bar joists. The workers spaced and locked the roof bar joists with a Hambro roll bar at each end but they did not weld them to the support beams. The joists were mostly spaced 4 ft thus plumbing and welding could have preceded the pour. The ironworkers declined to work above them. On the morning of the pour, the first-level subcontractor removed enough roll bars to move one joist in each bay to increase the opening for the concrete hose, which had a flanged coupling 10 ft from the discharge end. The boom operator was on the same floor but at a distance from the concrete crew. Moving the hose discharge end for about two hours, the pour had reached the center of the floor. The hose either bounced or was being raised and, as a result, three adjacent 20-feet joists were dislodged, 140 lb each, and one end dropped the other partly supported by roll bars. Three subcontractors sustained light injuries and one subcontractor sustained a bit more serious injury, so the work stopped. The concrete set before concrete removal began on another day. The ironworkers reset, plumbed, and welded all the joists in about two hours.
Keywords: joist, roof, pouring, boom, construction, welding, laceration, pump, concrete, contusion
Inspection Degree Nature Occupation
1 108433335 Hospitalized injury Bruise/Contus/Abras Concrete and terrazzo finishers
2 108433335 Hospitalized injury Bruise/Contus/Abras Concrete and terrazzo finishers
3 108433335 Hospitalized injury Cut/Laceration Concrete and terrazzo finishers
4 108433335 Hospitalized injury Dislocation Construction laborers

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.