Powered by GoogleTranslate

Inspection Detail

Inspection: 107913998 - Knoxville Utility-Operations

Inspection Information - Office: Tennessee Osha Knoxville Office - Public Sector

 

Inspection Nr: 107913998
Report ID: 0454734
Date Opened: 04/11/1989

Site Address:
Knoxville Utility-Operations
4500 Middlebrook Pk
Knoxville, TN 37950

Mailing Address:
Po Box 5907, Knoxville, TN 37909

Union Status: Union

SIC:9311

NAICS: 0 


Inspection Type: Accident

Scope: Partial

Advanced Notice: N

Ownership: LocalGovt

Safety/Health: Safety

Close Conference: 04/26/1989

Emphasis:

Case Closed: 06/05/1989


Related Activity
Type Activity Nr Safety Health
Accident 360284020
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 2 2
Current Violations 2 2
Initial Penalty $0 $0 $0 $0 $0 $0
Current Penalty $0 $0 $0 $0 $0 $0
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Serious 19260950 C01 I 05/03/1989 06/02/1989 $0 $0 $0 -  
2. 01002 Serious 19260950 C01 II 05/03/1989 06/02/1989 $0 $0 $0 -  

Investigation Summary

Investigation Nr: 762922
Event: 04/11/1989
ELECTRIC SHOCK - CONTACT WITH OVERHEAD LINE THRU LOAD LINE

A POWER LINE CONSTRUCTION CREW WAS INSTALLING 69-KILOVOLT SWITCHES WEIGHING ABOUT 250 POUNDS EACH. THE SWITCHES WERE BEING INSTALLED NEAR THE TOP OF A 90-FOOT UTILITY POLE. THE POLE SUPPORTED TWO CIRCUITS OF DIFFERENT VOLTAGES. THE TOP CIRCUIT, WHERE THE SWITCHES WERE TO BE INSTALLED, WAS 69 KILOVOLTS AND WAS DEENERGIZED. THE BOTTOM CIRCUIT WAS 13 KILOVOLTS. IT WAS NOT DEENERGIZED, NOR WAS IT PROTECTED BY INSULATING GUARDS. A CRANE WAS BEING USED TO POSITION THE SWITCHES FOR INSTALLATION. THE CRANE BOOM WAS DIRECTLY OVER THE POLE. THE LOAD LINE AND HOOK WAS HANGING ABOUT 6 OR 7 FEET FROM THE ENERGIZED CIRCUIT. PRESUMABLY, EITHER THE LOAD LINE OR THE LOAD CONTACTED THE ENERGIZED POWER LINE, ELECTROCUTING ONE OF THE EMPLOYEES ON THE CREW. (THE SECOND PAGE OF OSHA 170 FORM, WHICH SHOULD HAVE DESCRIBED HOW CONTACT OCCURRED, WAS MISSING.)

Keywords: OVERHEAD POWER LINE, ELECTRICAL, POWER LINE WORKER, ELECTROCUTED, SUSPENDED LOAD, E PTD, ELEC UTILITY WORK, LOAD LINE, CRANE

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 107913998 Fatality Electric Shock Electrical power installers and repairers
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.