Inspection: 106335946 - Quest Aerospace
Inspection Information - Office: San Francisco Ro
Site Address:
Quest Aerospace
16750 South Avenue, C
Somerton, AZ 85350
Mailing Address:
350 East 18th Street, Yuma, AZ 85364
Union Status: NonUnion
SIC:2899
NAICS: 0
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 04/30/1998
Emphasis:
Case Closed: 03/18/1999
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 360989727 |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 13 | 3 | 16 | |||
| Current Violations | 13 | 3 | 16 | |||
| Initial Penalty | $86,000 | $210,000 | $0 | $0 | $0 | $296,000 |
| Current Penalty | $60,200 | $157,500 | $0 | $0 | $0 | $217,700 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001 | Serious | 19100119 C01 | 09/17/1998 | 11/04/1998 | $4,900 | $7,000 | $0 | 10/01/1998 | F - Formal Settlement | |
| 2. | 01002 | Serious | 19100119 C02 | 09/17/1998 | 11/04/1998 | $4,900 | $7,000 | $0 | 10/01/1998 | F - Formal Settlement | |
| 3. | 01003 | Serious | 19100119 D02 I | 09/17/1998 | 11/04/1998 | $4,900 | $7,000 | $0 | 10/01/1998 | F - Formal Settlement | |
| 4. | 01004 | Serious | 19100119 E01 | 09/17/1998 | 11/04/1998 | $4,900 | $7,000 | $0 | 10/01/1998 | F - Formal Settlement | |
| 5. | 01005 | Serious | 19100119 F01 I | 09/17/1998 | 11/04/1998 | $4,900 | $7,000 | $0 | 10/01/1998 | F - Formal Settlement | |
| 6. | 01006 | Serious | 19100119 G03 | 09/17/1998 | 11/04/1998 | $4,900 | $7,000 | $0 | 10/01/1998 | F - Formal Settlement | |
| 7. | 01007 | Serious | 19100119 I02 III | 09/17/1998 | 11/04/1998 | $4,900 | $7,000 | $0 | 10/01/1998 | F - Formal Settlement | |
| 8. | 01008 | Serious | 19100119 J02 | 09/17/1998 | 11/04/1998 | $4,900 | $7,000 | $0 | 10/01/1998 | F - Formal Settlement | |
| 9. | 01009 | Serious | 19100119 J03 | 09/17/1998 | 11/04/1998 | $4,900 | $7,000 | $0 | 10/01/1998 | F - Formal Settlement | |
| 10. | 01010 | Serious | 19100119 J04 IV | 09/17/1998 | 11/04/1998 | $4,900 | $7,000 | $0 | 10/01/1998 | F - Formal Settlement | |
| 11. | 01011 | Serious | 19100119 K01 | 09/17/1998 | 11/04/1998 | $4,900 | $7,000 | $0 | 10/01/1998 | F - Formal Settlement | |
| 12. | 01012 | Serious | 19100119 L01 | 09/17/1998 | 11/04/1998 | $4,900 | $7,000 | $0 | 10/01/1998 | F - Formal Settlement | |
| 13. | 01013 | Serious | 19100243 C03 | 09/17/1998 | 11/04/1998 | $1,400 | $2,000 | $0 | 10/01/1998 | F - Formal Settlement | |
| 14. | 02001 | Willful | 19100119 F04 | 09/17/1998 | 11/04/1998 | $52,500 | $70,000 | $0 | 10/01/1998 | F - Formal Settlement | |
| 15. | 02002 | Willful | 19100119 J05 | 09/17/1998 | 11/04/1998 | $52,500 | $70,000 | $0 | 10/01/1998 | F - Formal Settlement | |
| 16. | 02003 | Willful | 19100307 B | 09/17/1998 | 11/04/1998 | $52,500 | $70,000 | $0 | 10/01/1998 | F - Formal Settlement |
Investigation Summary
On March 27, 1998, Employees #1 through #5 were working in the maintenance shop of Quest Aerospace, a division of the toy rocket motor manufacturer, Toy Biz, Inc. The facility consisted of two bunkers used to store explosives, three production buildings, one mixing building, a maintenance shop, and an office trailer. The bunkers, production buildings, and mixing building were constructed of concrete blocks. The product being manufactured was a rocket motor consisting of a 2 3/4 in. by 5/8 in. cardboard cylinder containing black powder, with a clay cap at each end. They were use to propel the toy rockets and were ignited by lighting cords that were inserted in the nozzle end of the motor. The basic manufacturing process at this facility consisted of removing the black powder from the bunkers, blending it with water and alcohol in the mixing building, and using index machines in the production building to compress the black powder explosive into a cardboard cylinder. The indexing machines also placed the clay cap at each end of the cylinder. Workers often used pneumatic drills, mounted in small presses, to drill black powder out of the nozzle end of the motor to make the correct shape to insert the igniter cord and to ensure proper rocket motor propulsion. This rework operation, called motor drilling or kiss drilling, was normally done in the mixing building. At approximately 11:40 a.m., a flash fire occurred in the maintenance shop. Employees #1 through #4 were killed and Employee #5 was hospitalized with burns. The material of the coveralls worn by the workers may have contributed to their injuries. (Note: Complete text of the abstract was not provided.)
Keywords: BURN, CLOTHING, EXPLOSIVES, WORK RULES, FIRE
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 106335946 | Fatality | Burn/Scald(Heat) | Explosives workers | ||
| 2 | 106335946 | Fatality | Burn/Scald(Heat) | Not specified mechanics and repairers | ||
| 3 | 106335946 | Hospitalized injury | Burn/Scald(Heat) | Not specified mechanics and repairers | ||
| 4 | 106335946 | Fatality | Burn/Scald(Heat) | Explosives workers | ||
| 5 | 106335946 | Fatality | Burn/Scald(Heat) | Explosives workers |