Inspection Detail
Inspection: 3348026 - Jeb South
Inspection Information - Office: Va-E-Manassas (Regional Office)- Safety 0355114
Site Address:
Jeb South
2520 Oakville Street
Alexandria, VA 22301
Mailing Address:
Delsea Drive And Harvard Avenue, Westville, NJ 08093
Union Status: NonUnion
SIC:3231
NAICS: 0
Inspection Type: Complaint
Scope: Complete
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 06/05/1985
Planning Guide: Safety-Manufacturing
Emphasis:
Case Closed: 10/16/1985
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Complaint | 70103726 | Yes |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 1 | 6 | 7 | |||
| Current Violations | 1 | 6 | 7 | |||
| Initial Penalty | $250 | $0 | $0 | $0 | $0 | $250 |
| Current Penalty | $250 | $0 | $0 | $0 | $0 | $250 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001 | Serious | 19100212 A03 II | 08/26/1985 | 09/28/1985 | $250 | $250 | $0 | - | ||
| 2. | 02001 | Other | ARM0035 A | 08/26/1985 | 09/28/1985 | $0 | $0 | $0 | - | ||
| 3. | 02002 | Other | 19100024 H | 08/26/1985 | 08/30/1985 | $0 | $0 | $0 | - | ||
| 4. | 02003 | Other | 19100106 E02 IVD | 08/26/1985 | 08/30/1985 | $0 | $0 | $0 | - | ||
| 5. | 02004 | Other | 19100212 A01 | 08/26/1985 | 09/13/1985 | $0 | $0 | $0 | - | ||
| 6. | 02005 | Other | 19100213 H04 | 08/26/1985 | 08/30/1985 | $0 | $0 | $0 | - | ||
| 7. | 02006 | Other | 19100304 F05 V | 08/26/1985 | 09/03/1985 | $0 | $0 | $0 | - |
Investigation Summary
EMPLOYEE #1 WAS ASSIGNED TO FILL SPACES FOR WINDOWS, USING A "SPACER FILLER MACHINE". THE POINT OF OPERATION IS AN OPENING 1 INCH HIGH AND ONE INCH DEEP, FLANKED BY OPEN RUBBER JAWS. BEHIND THE JAWS IS A METAL GATE WHICH OPENS AND CLOSES DURING THE MACHINE'S CYCLE, CREATING A SHEARING HAZARD. WHEN THE MACHINE IS STARTED, THE JAWS CLOSE ON THE SPACERS, THE GATE OPENS AND THE MACHINE RISES TO ALLOW THE CHEMICAL FILLER TO ENTER THE SPACERS. THIS PROCESS IS REVERSED TO END THE CYCLE. IN THIS INSTANCE THE RUBBER JAWS OPENED BUT THE GATE DIDN'T CLOSE AT THE END OF THE CYCLE. EMPLOYEE #1 STATED THAT THE SPACERS STUCK IN THE MACHINE. WHEN HE TRIED TO FREE THEM, THE MACHINE MALFUNCTIONED, CLAMPING ONTO HIS FINGERS. THE LOWERING GATE AMPUTATED THE TWO MIDDLE FINGER TIPS ON HIS RIGHT HAND.
Keywords: AMPUTATED, FINGER, MECH MAT HANDLING
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 3348026 | Hospitalized injury | Amputation | Misc. metal,plastic,stone&glass-working mach. op's |
Translate