Inspection Detail
Inspection: 315346197 - Burtech Pipeline Inc
Inspection Information - Office: San Diego District Office
Site Address:
Burtech Pipeline Inc
5th And Ash
San Diego, CA 92101
Mailing Address:
102 Second St, Encinitas, CA 92024
Union Status: NonUnion
SIC:1623
NAICS: 237110/Water and Sewer Line and Related Structures Construction
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 02/25/2013
Emphasis:
Case Closed: 05/23/2016
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 101472611 |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 13 | 13 | ||||
| Current Violations | 13 | 13 | ||||
| Initial Penalty | $0 | $0 | $0 | $9,435 | $0 | $9,435 |
| Current Penalty | $0 | $0 | $0 | $5,135 | $0 | $5,135 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001 | Other | 1509 A | 02/26/2013 | 03/31/2013 | $0 | $280 | $0 | 03/11/2013 | F - Formal Settlement | |
| 2. | 01002 | Other | 1510 A | 02/26/2013 | 03/31/2013 | $450 | $750 | $0 | 03/11/2013 | F - Formal Settlement | |
| 3. | 01003 | Other | 1512 B | 02/26/2013 | 03/22/2013 | $225 | $280 | $0 | 03/11/2013 | F - Formal Settlement | |
| 4. | 01004 | Other | 1512 C | 02/26/2013 | 03/22/2013 | $0 | $185 | $0 | 03/11/2013 | F - Formal Settlement | |
| 5. | 01005 | Other | 1512 E | 02/26/2013 | 03/22/2013 | $0 | $185 | $0 | 03/11/2013 | F - Formal Settlement | |
| 6. | 01006 | Other | 1512 I | 02/26/2013 | 03/22/2013 | $0 | $185 | $0 | 03/11/2013 | F - Formal Settlement | |
| 7. | 01007 | Other | 1524 A02 | 02/26/2013 | 03/08/2013 | $225 | $420 | $0 | 03/11/2013 | F - Formal Settlement | |
| 8. | 01008 | Other | 1527 A01 | 02/26/2013 | 03/22/2013 | $300 | $560 | $0 | 03/11/2013 | F - Formal Settlement | |
| 9. | 01009 | Other | 3395 F01 | 02/26/2013 | 03/31/2013 | $0 | $280 | $0 | 03/11/2013 | F - Formal Settlement | |
| 10. | 01010 | Other | 3395 F03 | 02/26/2013 | 03/31/2013 | $335 | $560 | $0 | 03/11/2013 | F - Formal Settlement | |
| 11. | 01011 | Other | 340 | 02/26/2013 | 03/08/2013 | $300 | $375 | $0 | 03/11/2013 | F - Formal Settlement | |
| 12. | 01012 | Other | 342 A | 02/26/2013 | 03/01/2013 | $3,000 | $5,000 | $0 | 03/11/2013 | F - Formal Settlement | |
| 13. | 01013 | Other | 3203 B02 | 02/26/2013 | 03/22/2013 | $300 | $375 | $0 | 03/11/2013 | F - Formal Settlement |
Investigation Summary
On August 30, 2012, Employee #1, a 43-year-old male laborer with Burtech Pipeline Inc., was working at a public works project in San Diego. The worksite was a public road where the employer was replacing an underground sewage lines and manholes. Employee #1 was moving aluminum speed shore rails that were five-feet long from one location to another. Employee #1 was balancing the speed shore on his shoulder. When he went to drop the speed shore on the ground, the mechanism snapped shut and his finger was in the pinch point. Employee #1 suffered an amputation of the tip of his left index finger distally from the nail bed, and there were bone fractures consistent with a crushing injury. Employee #1 was transported to Scripps Mercy Hospital where he was hospitalized and underwent surgery.
Keywords: AMPUTATED, FINGER, SHORING
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 315346197 | Hospitalized injury | Amputation | Construction laborers |