Inspection Detail
Inspection: 315075853 - Anderson Brothers Water Well
Inspection Information - Office: Fresno District Office
Site Address:
Anderson Brothers Water Well
Ave 28 1/2 E Of Sante Fe Dr
Chowchilla, CA 93610
Mailing Address:
3490 Riverview Dr, Madera, CA 93637
Union Status: NonUnion
SIC:1781
NAICS: 237110/Water and Sewer Line and Related Structures Construction
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 06/20/2012
Emphasis: S:Construction (Cship)
Case Closed: 09/19/2012
Type | Activity Nr | Safety | Health |
---|---|---|---|
Accident | 101086924 |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 1 | 1 | ||||
Current Violations | 1 | 1 | ||||
Initial Penalty | $0 | $0 | $0 | $175 | $0 | $175 |
Current Penalty | $0 | $0 | $0 | $175 | $0 | $175 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001 | Other | 3203 A | 08/16/2012 | 08/21/2012 | $175 | $175 | $0 | - |
Investigation Summary
On May 21, 2012, Employee #1, of Anderson Brothers Water Well Drilling, was pouring gasoline into the carburetor of his truck while his supervisor was starting the engine from inside the cab of the truck. The engine back-fired, and Employee #1was burned on his hand and forearm by the resultant flash. Employee #1 was taken to the local hospital for treatment but was transferred to an acute care hospital. He was treated and then released the next morning from the hospital.
Keywords: BURN, DRILL OPERATOR, FOREARM, IGNITION SYSTEM, WELL, CARBURETOR, TRUCK, FLASHBACK, GASOLINE, HAND
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 315075853 | Hospitalized injury | Burn/Scald(Heat) | Laborers, except construction |