Inspection Detail
Inspection: 315072009 - Southern California Edison Co.
Inspection Information - Office: Fresno District Office
Site Address:
Southern California Edison Co.
Rush Creek Power House
Bishop, CA 93512
Mailing Address:
P O Box 900, Rosemead, CA 91770
Union Status: Union
SIC:4939
NAICS: 221111/Hydroelectric Power Generation
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Health
Close Conference: 09/07/2011
Emphasis:
Case Closed: 04/17/2012
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 101085207 |
Investigation Summary
At approximately 7:00 a.m. on September 7, 2011, Employee #1 was observing another contractor at a hydroelectric power facility when he experienced discomfort. At approximately 9:30 a.m., another employee was assigned to drive Employee #1 home. While en route, his condition deteriorated. Employee #1 was taken directly to Northern Inyo Hospital, where he died of a heart attack.
Keywords: CARDIOVASC SYSTEM, HEART, HEART ATTACK, CARDIAC ARREST
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 315072009 | Fatality | Other | Mechanical controls and valve repairers |
Translate