Inspection Detail
Inspection: 315058289 - Compco Industries, Inc.
Inspection Information - Office: Cleveland Area Office
Site Address:
Compco Industries, Inc.
400 W. Railroad St., Suite 2
Columbiana, OH 44408
Mailing Address:
, , 00000
Union Status: NonUnion
SIC:3469
NAICS: 332116/Metal Stamping
Inspection Type: Complaint
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 11/12/2010
Emphasis: L:Piv, N:Amputate, S:Amputations, S:Electrical, S:Noise, S:Powered Ind Vehicle
Case Closed: 05/31/2013
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Complaint | 208035626 | Yes | Yes |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 16 | 2 | 1 | 19 | ||
| Current Violations | 16 | 2 | 1 | 19 | ||
| Initial Penalty | $60,200 | $98,000 | $0 | $700 | $0 | $158,900 |
| Current Penalty | $36,120 | $58,800 | $0 | $420 | $0 | $95,340 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001 | Serious | 5A0001 | 04/28/2011 | 05/06/2011 | $2,100 | $3,500 | $0 | I - Informal Settlement | ||
| 2. | 01002A | Serious | 19100147 C04 I | 04/28/2011 | 06/24/2011 | $2,940 | $4,900 | $0 | I - Informal Settlement | ||
| 3. | 01002B | Serious | 19100147 C06 I | 04/28/2011 | 05/31/2011 | $0 | $0 | $0 | I - Informal Settlement | ||
| 4. | 01003 | Serious | 19100147 D04 I | 04/28/2011 | 05/31/2011 | $2,940 | $4,900 | $0 | I - Informal Settlement | ||
| 5. | 01004 | Serious | 19100157 G02 | 04/28/2011 | 05/31/2011 | $1,260 | $2,100 | $0 | I - Informal Settlement | ||
| 6. | 01005A | Serious | 19100212 A01 | 04/28/2011 | 05/06/2011 | $1,680 | $2,800 | $0 | I - Informal Settlement | ||
| 7. | 01005B | Serious | 19100212 A01 | 04/28/2011 | 05/06/2011 | $0 | $0 | $0 | I - Informal Settlement | ||
| 8. | 01005C | Serious | 19100212 A01 | 04/28/2011 | 05/06/2011 | $0 | $0 | $0 | I - Informal Settlement | ||
| 9. | 01006A | Serious | 19100213 H01 | 04/28/2011 | 05/06/2011 | $1,680 | $2,800 | $0 | I - Informal Settlement | ||
| 10. | 01006B | Serious | 19100213 H03 | 04/28/2011 | 05/03/2011 | $0 | $0 | $0 | I - Informal Settlement | ||
| 11. | 01007 | Serious | 19100217 B07 III | 04/28/2011 | 05/06/2011 | $2,100 | $3,500 | $0 | I - Informal Settlement | ||
| 12. | 01008A | Serious | 19100217 C01 I | 04/28/2011 | 05/11/2011 | $2,940 | $4,900 | $0 | I - Informal Settlement | ||
| 13. | 01008B | Serious | 19100217 C03 IIIF | 04/28/2011 | 05/11/2011 | $0 | $0 | $0 | I - Informal Settlement | ||
| 14. | 01009 | Serious | 19100217 C03 VIID | 04/28/2011 | 05/06/2011 | $2,100 | $3,500 | $0 | I - Informal Settlement | ||
| 15. | 01010 | Serious | 19100217 C05 I | 04/28/2011 | 05/11/2011 | $2,940 | $4,900 | $0 | I - Informal Settlement | ||
| 16. | 01011 | Serious | 19100217 D09 IV | 04/28/2011 | 05/06/2011 | $2,940 | $4,900 | $0 | I - Informal Settlement | ||
| 17. | 01012 | Serious | 19100217 E01 II | 04/28/2011 | 05/31/2011 | $2,940 | $4,900 | $0 | I - Informal Settlement | ||
| 18. | 01013 | Serious | 19100217 F02 | 04/28/2011 | 05/03/2011 | $2,100 | $3,500 | $0 | I - Informal Settlement | ||
| 19. | 01014 | Serious | 19100219 B01 | 04/28/2011 | 05/06/2011 | $2,520 | $4,200 | $0 | I - Informal Settlement | ||
| 20. | 01015 | Serious | 19100219 I02 | 04/28/2011 | 05/06/2011 | $1,680 | $2,800 | $0 | I - Informal Settlement | ||
| 21. | 01016 | Serious | 19100253 B02 II | 04/28/2011 | 05/06/2011 | $1,260 | $2,100 | $0 | I - Informal Settlement | ||
| 22. | 02001 | Willful | 19100212 A01 | 04/28/2011 | 05/31/2011 | $29,400 | $49,000 | $0 | I - Informal Settlement | ||
| 23. | 02002 | Willful | 19100217 C01 I | 04/28/2011 | 05/11/2011 | $29,400 | $49,000 | $0 | I - Informal Settlement | ||
| 24. | 03001A | Other | 19040007 B03 | 04/28/2011 | 05/06/2011 | $420 | $700 | $0 | I - Informal Settlement | ||
| 25. | 03001B | Other | 19040029 B01 | 04/28/2011 | 05/06/2011 | $0 | $0 | $0 | I - Informal Settlement |
Investigation Summary
At approximately 9:45 a.m. on August 4, 2010, Employee #1 and his coworker were operating a 1, 000 ton, Clearing Bliss Niagara, part-revolution, two-hand control, mechanical power press. While the coworker was located at the front of the press actuating scrap metal, Employee #1 was located at the rear, pulling the scrap from the press. The product being processed was new to the company and required additional machinery that the employer did not have. Instead, the plant manager instructed Employee #1 to use the existing power press, which although had light curtains at the front, had no safeguarding at its rear. Also, due to the incompatibility of the new product and the existing press, Employee #1 was required to reach into the press, at the rear, to retrieve scrap after each and every cycle. As Employee #1 reached into the press to retrieve a piece of scrap, the press cycled and crushed his left index finger. Employee #1 was taken to a nearby hospital, where he was hospitalized and treated for his injury, requiring amputation.
Keywords: AMPUTATED, POWER PRESS, FINGER, GUARD, MACHINE OPERATOR, CAUGHT BETWEEN, MANUAL MAT HANDLING
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 315058289 | Hospitalized injury | Amputation | Occupation not reported |
Translate