Inspection: 314822032 - O.P. Handyman

Inspection Information - Office: Van Nuys District Office

 

Inspection Nr: 314822032
Report ID: 0950643
Date Opened: 08/30/2010

Site Address:
O.P. Handyman
4595 Camino Del Mirasol
Santa Barbara, CA 93110

Mailing Address:
501 Andrea Dr., Oxnard, CA 93033

Union Status: NonUnion

SIC:1521

NAICS: 236115/New Single-Family Housing Construction (except Operative Builders)


Inspection Type: Accident

Scope: Partial

Advanced Notice: N

Ownership: Private

Safety/Health: Safety

Close Conference: 09/03/2010

Emphasis:

Case Closed: 02/01/2015


Related Activity
Type Activity Nr Safety Health
Accident 102633716
Accident 102633815
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 1 2 3
Current Violations 3 3
Initial Penalty $18,000 $0 $0 $520 $0 $18,520
Current Penalty $0 $0 $0 $780 $0 $780
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Other 1509 A 11/22/2010 12/23/2010 $260 $260 $0 12/29/2010 F - Formal Settlement  
2. 01002 Other 5194 E01 11/22/2010 12/23/2010 $260 $260 $0 12/29/2010 F - Formal Settlement  
3. 02001 Other 1534 B 11/22/2010 12/23/2010 $260 $18,000 $0 12/29/2010 F - Formal Settlement  

Investigation Summary

Investigation Nr: 202469052
Event: 08/30/2010
Employee Is Killed in Explosion and Flash Fire

At approximately 9:25 a.m. on August 30, 2010, Employee #1 was using Klean-Strip lacquer thinner, a flammable liquid, to remove linoleum adhesive from the floor of a laundry room. The laundry room was approximately 12 ft by 22 ft. It had a window (35.5 in. in height by 47.5 in. in width) and a door leading to the garage of the house and another door leading to the backyard. The laundry room was empty except for some built in cabinets, a water heater and solar storage tank. While Employee #1 used the flammable lacquer, the room was unventilated with both doors closed and only the window open. As Employee #1 removed the adhesive, flammable vapors were created. The water heater with its electrical heating elements ignited the vapor and resulted in an explosion and flash fire. The explosion and fire struck Employee #1, causing second and third degree burns over 85 percent of his body. Emergency medical personnel were summoned. They arrived and transported him to a hospital where he was later airlifted to a burn center. He died at approximately 3:30 p.m. on the same day.

Keywords: BURN, FLAMMABLE LIQUID, FLAMMABLE VAPORS, CLEANING, FIRE, IGNITION SYSTEM

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 314822032 Fatality Burn(Chemical) Construction laborers
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.