Inspection Detail
Inspection: 314370560 - Earth Tech (De), Llc
Inspection Information - Office: Tampa Area Office
Site Address:
Earth Tech (De), Llc
Sydney Road, East Of N. Dover
Plant City, FL 33563
Mailing Address:
2620 Hunt Road, Land O'Lakes, FL 34638
Union Status: NonUnion
SIC:1771
NAICS: 238990/All Other Specialty Trade Contractors
Inspection Type: Accident
Scope: Complete
Advanced Notice: Y
Ownership: Private
Safety/Health: Safety
Close Conference: 03/22/2010
Emphasis: L:Ohpwrlne, S:Electrical
Case Closed: 10/11/2010
Type | Activity Nr | Safety | Health |
---|---|---|---|
Accident | 102639036 |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 10 | 10 | ||||
Current Violations | 10 | 10 | ||||
Initial Penalty | $19,800 | $0 | $0 | $0 | $0 | $19,800 |
Current Penalty | $15,840 | $0 | $0 | $0 | $0 | $15,840 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001 | Serious | 19100157 E03 | 08/23/2010 | 09/25/2010 | $800 | $1,000 | $0 | I - Informal Settlement | ||
2. | 01002 | Serious | 19100157 G01 | 08/23/2010 | 09/25/2010 | $800 | $1,000 | $0 | I - Informal Settlement | ||
3. | 01003A | Serious | 19100215 A04 | 08/23/2010 | 09/02/2010 | $1,400 | $1,750 | $0 | I - Informal Settlement | ||
4. | 01003B | Serious | 19100215 B09 | 08/23/2010 | 09/02/2010 | $0 | $0 | $0 | I - Informal Settlement | ||
5. | 01004 | Serious | 19100242 B | 08/23/2010 | 08/31/2010 | $1,400 | $1,750 | $0 | I - Informal Settlement | ||
6. | 01005 | Serious | 19100303 F01 | 08/23/2010 | 09/25/2010 | $1,000 | $1,250 | $0 | I - Informal Settlement | ||
7. | 01006 | Serious | 19100303 G02 I | 08/23/2010 | 08/27/2010 | $1,000 | $1,250 | $0 | I - Informal Settlement | ||
8. | 01007 | Serious | 19100305 G01 IVA | 08/23/2010 | 09/06/2010 | $800 | $1,000 | $0 | I - Informal Settlement | ||
9. | 01008A | Serious | 19101200 E01 | 08/23/2010 | 09/25/2010 | $800 | $1,000 | $0 | I - Informal Settlement | ||
10. | 01008B | Serious | 19101200 H03 | 08/23/2010 | 09/25/2010 | $0 | $0 | $0 | I - Informal Settlement | ||
11. | 01009 | Serious | 19260416 A01 | 08/23/2010 | 08/27/2010 | $3,920 | $4,900 | $0 | I - Informal Settlement | ||
12. | 01010 | Serious | 19260416 A03 | 08/23/2010 | 08/27/2010 | $3,920 | $4,900 | $0 | I - Informal Settlement |
Investigation Summary
On March 15th, 2010, Employee #1 and Employee #2 were removing 1 inch metal pipe from a drilled hole in the road. The pipe was constructed of 10 ft. segments. Both employees pulled 30 ft. of the pipe out of the hole and made contact with the overhead power line in the process resulting in the electrocution of Employee #1 and burns to Employee #2.
Keywords: BURN, OVERHEAD POWER LINE, ELECTROCUTED
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 314370560 | Fatality | Electric Shock | Supervisors; handlers,equip-cleaners,laborers nec |