Inspection Detail

Inspection: 313301707 - Hydaker Wheatlake Co

Inspection Information - Office: Miosha Construction Safety & Health Division

 

Inspection Nr: 313301707
Report ID: 0552651
Date Opened: 06/27/2011

Site Address:
Hydaker Wheatlake Co
Power Pole Z 24 Near Rice Rd
Copemish, MI 49625

Mailing Address:
Po Box 147 420 Roth St, Reed City, MI 49677

Union Status: Union

SIC:1623

NAICS: 237130/Power and Communication Line and Related Structures Construction


Inspection Type: Accident

Scope: Partial

Advanced Notice: N

Ownership: Private

Safety/Health: Safety

Close Conference: 10/10/2011

Planning Guide: Safety-Construction

Emphasis: S:Construction Fatalities

Case Closed: 06/10/2014


Related Activity
Type Activity Nr Safety Health
Accident 101404143
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 1 6 7
Current Violations 6 6
Initial Penalty $6,300 $378,000 $0 $0 $0 $384,300
Current Penalty $42,000 $0 $0 $0 $0 $42,000
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Serious 4084162601 10/14/2011 10/19/2011 $7,000 $6,300 $0 12/05/2011 F - Formal Settlement  
2. 02001 Serious 4084162701 A 10/14/2011 10/19/2011 $7,000 $63,000 $0 12/05/2011 F - Formal Settlement  
3. 02002 Serious 4084164101 10/14/2011 10/19/2011 $7,000 $63,000 $0 12/05/2011 F - Formal Settlement  
4. 02003 Willful 4084164102 10/14/2011 10/19/2011 $63,000 $63,000 $0 12/05/2011 F - Formal Settlement Citation has been deleted.
5. 02004 Serious 4084164202 10/14/2011 10/19/2011 $7,000 $63,000 $0 12/05/2011 F - Formal Settlement  
6. 02005 Serious 4084164505 10/14/2011 10/19/2011 $7,000 $63,000 $0 12/05/2011 F - Formal Settlement  
7. 02006 Serious 4084164507 10/14/2011 10/19/2011 $7,000 $63,000 $0 12/05/2011 F - Formal Settlement  

Investigation Summary

Investigation Nr: 201408408
Event: 06/27/2011
Three Employees Sustain Burns from Energized Line

At approximately 8:30 p.m. on June 27, 2011, Employee #1, #2 and #3, all construction laborers, were working with two linemen setting a new power pole on an energized 69,000-volt power line. The two linemen were on the west side of the pole in a bucket truck holding the static (ground) line. Employee #1 was on the ground pushing the pole to center it in the hole, and Employee #2 was shoveling sand in the hole to backfill around the pole, while Employee #3 walked toward the pole after plumbing it with a string and plumb bob. One of the employees told the foreman that the pole needed to be centered more, so they raised the boom of the digger derrick. As they pushed the pole over and began to lower it back into the hole, the pole came in contact with the top west energized line, which caused a flash and loud boom. Employee #1, #2 and #3 sustained burns and were hospitalized for their injuries.

Keywords: DIGGER-DERRICK, ELECTRIC ARC, INSTALLING, BOOM, ELECTRIC CABLE, STRUCK AGAINST, ELEC UTILITY WORK, ELECTRIC SHOCK

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 313301707 Hospitalized injury Burn/Scald(Heat) Construction laborers
2 313301707 Hospitalized injury Burn/Scald(Heat) Construction laborers
3 313301707 Hospitalized injury Burn/Scald(Heat) Construction laborers
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.