Inspection Detail
Inspection: 312686314 - Seven Cs Erectors Inc
Inspection Information - Office: San Diego District Office
Site Address:
Seven Cs Erectors Inc
1335 Cesar Chavez Pkwy
San Diego, CA 92101
Mailing Address:
42255 Buck Rd, Hemet, CA 92544
Union Status: Union
SIC:1791
NAICS: 238120/Structural Steel and Precast Concrete Contractors
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 05/17/2011
Emphasis:
Case Closed: 09/17/2012
Type | Activity Nr | Safety | Health |
---|---|---|---|
Accident | 101465086 |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 1 | 1 | 2 | |||
Current Violations | 1 | 1 | 2 | |||
Initial Penalty | $18,000 | $0 | $0 | $260 | $0 | $18,260 |
Current Penalty | $1,565 | $0 | $0 | $165 | $0 | $1,730 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001 | Other | 3395 F03 | 05/20/2011 | 06/22/2011 | $165 | $260 | $0 | 06/29/2011 | F - Formal Settlement | |
2. | 02001 | Serious | 2946 A | 05/20/2011 | 05/30/2011 | $1,565 | $18,000 | $0 | 06/29/2011 | F - Formal Settlement |
Investigation Summary
A construction laborer was using a forklift to move the sidewall for a panel. The forklift or sidewall contacted an overhead power line, and the laborer received an electric shock. He was hospitalized for his injuries.
Keywords: OVERHEAD POWER LINE, ELECTRICAL, E C, INDUSTRIAL TRUCK, ELECTRIC SHOCK
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 312686314 | Hospitalized injury | Electric Shock | Construction laborers |